General information

IMO:
9199074
MMSI:
219000674
Callsign:
OZRH
Width:
18.0 m
Length:
48.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Denmark
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
35.0° / 0.0
Heading:
139.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Svendborg (Svendborg Port)
Area:
North Europe
Last seen:
2024-12-23
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-23
11m
2024-12-23
2024-12-23
18m
2024-12-23
2024-12-23
19m
2024-12-22
2024-12-23
12h 21m
2024-12-22
2024-12-22
20m
2024-12-22
2024-12-22
18m
2024-12-22
2024-12-22
21m
2024-12-22
2024-12-22
20m
2024-12-22
2024-12-22
22m
2024-12-21
2024-12-22
15h 18m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Ferry suffered faulty valve

Mon Jan 06 20:32:05 CET 2020 Timsen

Four double trips of the 'Marstal' between Ærøskøbing and Svendborg had to be cancelled on Jan 6, 2020, due to technical problems. Affected were the sailings departing from Ærøskøbing at 5.35 a.m., 8.35 a.m., 11.35 a.m. and 2.35 p.m. A fuel control valve needed to either be adjusted or repaired which meant that there was a risk of light and electricity going off, so the ship could not sail until completion of repairs. A technician was called to fix the error. The ferry was saiing again at 5.35 p.m. The affected passengers were transported aboard the 'Ærøxpressen' in the meantime.

Sailings cancelled due to thruster issue

Thu Apr 25 08:56:24 CEST 2019 Timsen

The "Marstal" had trouble to dock in Ærøskøbing upon ots arrival in port on April 24, 2019, at 10.20 a.m., and the crew decided to cancel the next sailings of the ferry due to the technical problems. The departure from Ærøskøbing at 10.35 a.m. and the return trip from Svendborg at 12.05 p.m. did not take place. Apparently there were problems with one of the thrusters, which gave less power to enter the harbour. The "Marstal" had also canceled a double trip on April 23, and all sailings of the ferry have been canceled on April 30 due to the needed repairs of the hydraulic engine for the bow thruster. It was suspected that there was a contamination in the tank of the hydraulic engine. In any case, the bow thruster did not work, which meant that we the departures had to be cancelled due to the wind in the area. Spare parts were to be delivered in the night of April 25. As the operator did not want to take the ferry out of the schedule during the weekend, the engineers will take the last departure in the night of April 29, and then start work which was expected to last the whole 30th April.

Marstal docked again

Thu Oct 15 10:29:40 CEST 2015 Timsen

In the morning of Oct 14 departures from Svendborg and Aero has been canceled after the "Marstal" was affected by technical problems. The ship had suffered gear trouble. Something with the gasket of one propeller was not in order. It had only returned to Ærøskøbing on Oct 13 after repair of allision damage at the Marstal Shipyard. At 10.50 p.m. the ferry returned to the yard to be docked again.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data