General information

IMO:
MMSI:
261182696
Callsign:
SR2696
Width:
8.0 m
Length:
75.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Poland
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
264.7° / 0.0
Heading:
265.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Germany
Last seen:
2025-04-24
< 1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-04-22
2025-04-22
3h 45m
2025-04-22
2025-04-22
28m
2025-04-19
2025-04-22
2d 16h 15m
2025-04-18
2025-04-19
16h 44m
2025-04-18
2025-04-18
1h 49m
2025-01-04
2025-04-17
102d 16h 32m
2025-01-03
2025-01-03
2h 21m
2024-12-05
2025-01-02
27d 23h 32m
2024-12-04
2024-12-04
54m
2024-11-23
2024-11-23
3h 19m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Uelzen
2025-04-22
Enter
Bad Bevensen
2025-04-22
Enter
LG Wendisch Evern
2025-04-22
Enter
Lüneburg
2025-04-22
Enter
Scharnebeck Süd
2025-04-22
Enter
Scharnebeck Nord
2025-04-22
Enter
Artlenburg
2025-04-22
Enter
Note: All times are in UTC

Latest news

Collision near Hünxe

Wed Nov 27 13:01:00 CET 2024 Timsen

On Nov 23, the 'Martyna' was in collision with a tank barge on the upper water of the lock of the Wesel-Datteln Canal in Hünxe. The tanker suffered a crack of about one meter length at the bow above the waterline. The fire bridgades Hünxe, Bruckhausen and Drevenack were alerted at 7:49 p.m. After an inspection, no further action was required by the fire department. The 'Martyna' waswas damaged under the waterline. The bow was severely deformed, causing water ingress. The hole was spread open with hydraulic rescue equipment in order to be able to use the ship's own submersible pump. The pumpe could cope with the water ingress, and the water level was kept constant. The site was handed over to the water police, who have begun further investigations. The fire department's work was completed after about two hours. Report with photos: https://www.presseportal.de/blaulicht/pm/50510/5917470

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data