General information

IMO:
MMSI:
232003370
Callsign:
GJGJ
Width:
27.0 m
Length:
16.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
181.4° /
Heading:
511.0° /
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2025-01-27
68 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
68 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-01-21
2021-01-28
7d 1h 34m
2016-06-26
2016-06-30
4d 5m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Essential investigations on the engine caused cancellations over several days

Wed Mar 19 10:29:41 CET 2025 Timsen

The 'Loch Ranza', serving on the route Tayinloan-Gigha had to undeergo essential investigations on the aft main engine since March 14, As a conseuence, the following sailings had to be cancelled: Departure Tayinloan - 12:00 p.m. Departure Gigha - 12:30 p.m The investigations required onthe engine were still going on throught to March 17, on which the following sailings were cancelled: Departure Tayinloan - 12:00 p.m. Departure Gigha - 12:30 p.m. The service was expected to resume with the 2:00 p.m. departure from Tayinloan. On March 18, the trouble has still not been resolved, and as a consequence the scheduled departures from Gigha at 07:35 a.m., 08:30 a.m., 09:30 a.m., 10:30 a.m. and 11:30 a.m. and from Tayinloan at 08:00 a.m., 09:00 a.m., 10:00 a.m. and 11:00 a.m. had to be cancelled. After the repairs were completed, the ship returned to its schedule on March 19.

Ferry delayed due to technical issue

Fri Mar 07 13:11:08 CET 2025 Timsen

The 'Loch Ranza', 206 gt (IMO: 8519887), serving on the route between Tayinloan and Gigha, suffered a technical issue on the morning of March 7, which was addressed in the port of Tayinloan. As a consequence, the scheduled departure from Tayinloan at 09:00 was delayed. It finally departed at 09:20 a.m., 20 minutes late.

Sailings cancelled due to essential maintenance

Mon Mar 03 11:20:37 CET 2025 Timsen

On March 3, the 'Loch Ranza', sailing on the route Tayinloan-Gigha, needed to carry out essential maintenance. As a consequence, a number of sailings had to be cancelled. Affected were the departures from Tayinloan at 12:00 p.m. and the departure from Gigha at 12:30 p.m.. The 2:00 p.m. crossing from Tayinloan remained liable to disruption or cancellation.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data