LEONARDO DA VINCI
Course/Position
Latest ports
Latest Waypoints
Latest news
Jan De Nul to dredge 10 mln m3 with 18 vessels in Sabetta this year
Jan De Nul plans to dredge 10 mln m3 in Sabetta during the 10-week period, IAA PortNews learnt form the company’s press center. The dredging fleet of Jan De Nul commenced operation on August 2, 2013. The dredging project is being implemented by eighteen vessels including cutter suction dredgers Leonardo Da Vinci (installed power 20.26 MW, length 129.7 m, draught 5.2 m), Niccolo Machiavelli (installed power 23.52 MW, length 138.5 m, draught 5.5 m), trailing suction hopper dredgers Bartolomeu Diaz (hopper capacity 14 thousand cbm, length 147,8 m, draught loaded 11.2 m, dredging depth up to 52 m), Al Idrisi (hopper capacity 7,500 cbm, length 119.1 m, draught loaded 8.15 m, dredging depth up to 46.4 m), Francesco Di Giorgio (hopper capacity 4,400 cbm, length 95.3 m, draught loaded 7.3 m, dredging depth up to 28.5 m), Amerigo Vespucci (hopper capacity 3,500 cbm, length 97.7 m, draught loaded 6.2 m, dredging depth up to 36.5 m), Pinta (hopper capacity 3,400 cbm, length 89.7 m, draught loaded 5.4 m, dredging depth up to 31 m), De Bougainville (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m, dredging depth up to 32 m), split hopper barges Boussole (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m), L’Aigle (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m), Tiger (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m), Astrolabe (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m), Le Guerrier (hopper capacity 3,700 cbm, length 99.5 m, draught loaded 5.85 m), anchor boat, tugboats, survey craft and pontoon for berth operations.
Upload News