FREDERICK G. CREED
Course/Position
Latest ports
Latest Waypoints
Latest news
Engine bridge control failure
The "Frederick G.Creed" suffered a failure of the engine bridge control while manoeuvring in the Quebec harbour, in position 46 49 12 N, 071 11 58 W, on May 10, 2019, at 09.15 a.m. The vessel returned to the pier for repairs using local controls. It sailed from Quebec on May 19 arrived in Havre St. Pierre on May 29.
Bottom touch in Quebec
The "Frederick G.Creed" touched the bottom while leaving Blanc Sablon wharf, Quebec, in position 51 24.833N, 057 09.081W, on May 31, 2018, at 05.05 a.m. No damage was reported.
Upload News