General information

IMO:
7016474
MMSI:
211208430
Callsign:
DFPG
Width:
10.0 m
Length:
68.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
171.6° / 0.0
Heading:
352.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Leer (Leer Hafen)
Area:
Germany
Last seen:
2024-12-22
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-29
22d 18h 41m
2024-11-28
2024-11-28
8h 37m
2024-10-18
2024-11-28
41d 1h 38m
2024-10-17
2024-10-18
12h 41m
2024-10-17
2024-10-17
3h 40m
2024-10-06
2024-10-17
10d 19h 33m
2024-10-05
2024-10-06
13h 25m
2024-10-05
2024-10-05
2h 53m
2024-10-04
2024-10-05
13h 17m
2024-10-04
2024-10-04
2h 40m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Delfzijl
2024-11-29
Enter
Borkum
2024-11-29
Leave
Norderney
2024-11-29
Leave
Weser Pilot Tonne 2
2024-11-29
Enter
Wangerooge
2024-11-29
Leave
Elbe 1
2024-11-29
Leave
Cuxhaven
2024-11-28
Leave
Note: All times are in UTC

Latest news

Fire on ship at yard

Tue Mar 06 21:29:06 CET 2018 Timsen

On March 6, 2018, at 7.20 p.m. a fire broke out in the engine room of the "Fair Lady" which was actually docked at the Mützelfeldt Yard in Cuxhaven. A guard had observed smoke and raised alarm. 50 men of the fire brigades from Cuxhaven and the volunteer forces from Groden and Cuxhaven-Mitte attended the fire at the Imperator Quay. They were supported by the fire boat "Bürgermeister Brauer" and the "Anneliese Kramer" of the DGzRS. At 8.30 p.m. the fire was out. The cause of the fire was still unclear. The police was investigating. Repairs at the Mützelfeldt Yard in Cuxhaven were completed on May 18. German report with photo and video: https://nord24.de/landkreis-cuxhaven/brand-auf-der-fair-lady-feuerwehr-rueckt-auf-der-muetzelfeldtwerft-in-cuxhaven-an

Trip to Helgoland suspended

Tue Jul 26 21:39:40 CEST 2011 Timsen

On July 26, 2011, the "Fair Lady" had to suspend its scheduled sailing from Bremerhaven to Helgoland and returned to the Sea Bath Quay. The reason for this was an increased cooling water temperature display. It was found out that only one controller for the thermostat was defective, this should be repaired as soon as possible. It was hoped to be back on track by July 27.

Rebuilding Fair Lady

Thu May 19 09:20:42 CEST 2011 Timsen

Rebuilding the "Fair Lady" from the "Lady Assa" is coming to its end in Cuxhaven. According to plan the ship will enter its new Bremerhaven-Helgoland-service on May 20, 2011. Just like the sister ship "Funny Girl" the large windows were exchanged by smaller bulleyes according to new EU-rules.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data