General information

IMO:
9708930
MMSI:
374277000
Callsign:
H9RF
Width:
30.0 m
Length:
177.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
324.7° / 0.0
Heading:
137.0° / 0.0
Speed:
Max speed:
Status:
moored
Area:
Caribbean Sea
Last seen:
2024-12-28
10 hours ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 day ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-20
2024-12-22
1d 23h 54m
2024-12-11
2024-12-20
8d 13h 30m
2024-12-04
2024-12-09
5d 18h 33m
2024-11-29
2024-11-29
2h 34m
2024-11-28
2024-11-29
10h 3m
2024-11-28
2024-11-28
2h 50m
2024-11-09
2024-11-13
4d 4h 46m
2024-10-15
2024-10-19
4d 2h 11m
2024-10-08
2024-10-09
1d 14h 38m
2024-09-16
2024-09-17
23h 18m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Anna Maria Island
2024-12-09
Leave
Anna Maria Island
2024-12-03
Enter
Colon Approach
2024-11-29
Leave
Gatun Locks
2024-11-29
Leave
Pedro Miguel Locks
2024-11-28
Leave
Miraflores Locks
2024-11-28
Leave
Puente de las Americas
2024-11-28
Leave
Note: All times are in UTC

Latest news

Fire off Cabo Sao Vincente

Tue Aug 10 21:11:44 CEST 2021 Timsen

The 'ES Care' suffered a fire onboard while proceeding south in the Sao Vincente Traffic Separation Scheme approximately 60 nautical miles west of Cabo Sao Vincente in the morning of Aug 3, 2021. The fire could be extinguished by the ship's crew, and there was no pollution. The Portuguese maritime safety authorities have commenced collecting evidence of the incident from their Panamanian counterpart maritime safety investigation office.

One deas after work boat capsized during assistance work

Mon Jan 30 20:38:41 CET 2017 Timsen

A port’s work boat assisting in the mooring of the "Swiftnes" at Tomakomai port, Hokkaido, capsized and sank after being dragged by a mooring rope, which got entangled in the bulkcarrier's propeller, in the morning of Jan 30, 2017. One of the two crew members died, the other one was rescued. After the "Swiftnes" docked at Tomakomai, an investigation into the accident was launched.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data