General information

IMO:
9319985
MMSI:
258069000
Callsign:
LFUR
Width:
19.0 m
Length:
93.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
158.5° / -7.0
Heading:
339.0° / -7.0
Speed:
Max speed:
Status:
waiting
Area:
Balearic Sea
Last seen:
2024-11-17
12 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-12
2024-11-12
12h 43m
2024-11-09
2024-11-10
22h 28m
2024-11-08
2024-11-08
6h
2024-11-06
2024-11-08
1d 19h 28m
2024-10-30
2024-10-31
1d 6h 51m
2024-10-15
2024-10-29
14d 16h 24m
2024-10-07
2024-10-09
1d 19h 26m
2024-10-06
2024-10-06
24m
2024-10-03
2024-10-04
12h 17m
2024-09-25
2024-09-26
1d 5h 33m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Isla de Alboran
2024-11-05
Enter
Strait of Gibraltar
2024-11-04
Leave
Canary Islands
2024-11-01
Leave
Canary Islands
2024-10-15
Enter
Fuerteventura
2024-10-14
Enter
Strait of Gibraltar
2024-10-12
Enter
Isla de Alboran
2024-10-11
Leave
Note: All times are in UTC

Latest news

Contract extension for Energy Swan

Wed Jul 17 10:04:43 CEST 2019 arnekiel

A contract extension has been secured with Wintershall Norge AS. The contract is in direct continuation of the charter contract from 2013. The large PSV Energy Swan was in 2013 chartered for a firm period of 4 years + optional (total of 5 years options).

Golden Energy inks charter with Wintershall

Wed Oct 09 10:09:32 CEST 2013 arnekiel

The Victor Restis-backed offshore vessel owner agreed a four-year deal with German energy firm Wintershall for the 5,304-dwt Energy Swan (built 2005). Wintershall will keep the vessel for four years firm and has four one-year options, Alesund-based Golden Energy said in a statement. The 3,250-dwt Energy Insula (built 2012) began the contract at the end of September until the end of the year when the Energy Swan is due to complete a short term contract with ConocoPhillips. http://www.tradewindsnews.com/offshore/324906/golden-energy-inks-charter

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data