General information

IMO:
9861811
MMSI:
229248000
Callsign:
9HA5313
Width:
47.0 m
Length:
294.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
201.8° / 10.0
Heading:
286.0° / 10.0
Speed:
Max speed:
Status:
anchorage
Area:
North Sea
Last seen:
2025-01-30
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-08-15
2025-01-26
163d 23h 32m
2024-03-19
2024-08-06
139d 22h 52m
2024-03-11
2024-03-13
2d 12h 39m
2024-03-02
2024-03-11
8d 16h 12m
2024-02-28
2024-03-01
1d 8h 31m
2024-02-10
2024-02-12
2d 2h 18m
2024-01-25
2024-01-26
1d 2h 42m
2024-01-08
2024-01-10
2d 8h 24m
2023-12-30
2024-01-01
1d 4h 52m
2023-12-27
2023-12-28
1d 4h 35m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Wangerooge
2025-01-26
Leave
Elbe 1
2025-01-26
Leave
Cuxhaven
2025-01-26
Leave
Brunsbuettel
2025-01-26
Leave
Glueckstadt
2025-01-26
Leave
Stade
2025-01-26
Leave
Note: All times are in UTC

Latest news

LNG carrier arrived in Stade wth police escort

Fri Mar 15 10:39:59 CET 2024 Timsen

The ''Energos Force' moored in the Stade industrial port, en route from Rotterdam, on the morning of March 15, 2024. A large contingent of police accompanied the ship on the Elbe. There was a protest with two inflatable boats. The four inmates expressed their protest” against the LNG terminal. The police picked up those involved a little later in the port of Kollmar. The "Energos Force" did not yet have any gas on board. According to the operator Deutsche Energie Terminal-Gesellschaft (DET), a test phase for the floating LNG terminal was initially underway. The terminal is then expected to supply gas to five million households per year. The "Energos Force" is the third of four ships chartered by the federal government to handle LNG tankers in the North Sea area in Stade, Wilhelmshaven and Brunsbüttel. The arrival was regarded as an important milestone in the district for security of supply and stabilization of gas prices in Germany and Europe. The district is also strengthening its position as an industrial and chemical location. The construction of the pier in Stade is considered the largest water-side construction project in Germany's ports. In addition to the floating terminal, the construction of an LNG terminal is planned in Stade and scheduled to be completed in 2027. Report with audio: https://www.ndr.de/nachrichten/niedersachsen/lueneburg_heide_unterelbe/Protest-begleitet-Ankunft-von-neuem-LNG-Terminal-in-Stade,energosforce100.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data