General information

IMO:
8955732
MMSI:
367409260
Callsign:
WDL2531
Width:
21.0 m
Length:
215.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
United States of America
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
163.1° / 0.0
Heading:
159.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
United States
Last seen:
2024-11-20
2 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-17
2024-11-18
2h 53m
2024-11-09
2024-11-09
8h 6m
2024-11-05
2024-11-06
1d 11h 9m
2024-10-30
2024-10-30
8h 13m
2024-10-27
2024-10-27
9h 46m
2024-10-25
2024-10-25
3h 4m
2024-10-22
2024-10-22
7h 20m
2024-10-18
2024-10-19
10h 50m
2024-10-16
2024-10-16
6h 31m
2024-10-13
2024-10-14
8h 41m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Tug-barge stuck in ice

Thu Jan 04 11:00:27 CET 2018 Timsen

The "Dorothy Ann-Pathfinder" tug-barge became stuck in the bay near Perry Monument on its way in for winter work in the afternoon of Jan 3, 2018. It iwa one of several ships are expected to arrive at Donjon Shipbuilding and Repair this month. Ice breaking was expected to start on Jan 3, so the ships could get through. Some were to be berthed at Dobbins Landing. The "Dorothy Ann-Pathfinder" belongs to Interlake Steamship Co. and travels the Great Lakes from March to January every year. Here are the tentative arrival dates for the other ships: Tug Defiance/Barge Ashtabula - Jan. 9 St. Clair - Jan. 12 Presque Isle - Jan. 15 - Mooring Main Channel Algoma Hansa - Jan. 19 Van Ekenvort Tug and Barge - Jan. 23 Report with video: http://www.yourerie.com/news/local-news/barge-stuck-in-bay-ice-breaking-vessel-on-its-way-to-help/899765716

Iron ore trade kicks off 2017 Great Lakes shipping season

Thu Mar 02 10:46:20 CET 2017 arnekiel

The 2017 Great Lakes shipping season began Tuesday when the U.S.-flag Dorothy Ann/Pathfinder departs her winter lay-up berth in Erie, Pa. The tug-barge unit will sail to Cleveland, where she will initiate the shuttle of iron ore from Cleveland Bulk Terminal to the ArcelorMittal steel mill at the end of the navigable portion of the Cuyahoga River on Wednesday, according to the Lake Carriers’ Association (LCA). The vessel will load approximately 15,000 tons that was mined on the Iron Range. The western coal trade will resume on March 22 when the Paul R. Tregurtha loads 62,000 tons at Superior Midwest Energy Terminal for delivery to Silver Bay. The Sault Ste. Marie locks will reopen on March 25. It typically handles more than 80 million tons of cargo in a season, about 80 percent of which transits the Poe Lock.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data