General information

IMO:
8103389
MMSI:
Callsign:
9LU2222
Width:
32.0 m
Length:
94.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Sierra Leone
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
159.3° / 0.0
Heading:
125.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Istanbul (Istanbul Port)
Area:
Sea of Marmara
Last seen:
2021-04-22
1312 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1312 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-04-22
2021-04-23
13h 45m
2021-01-14
2021-04-22
97d 20h 8m
2020-08-01
2021-01-05
157d 17h 24m
2020-07-19
2020-07-30
10d 23h 45m
2020-07-07
2020-07-17
10d 16h 56m
2020-07-02
2020-07-04
1d 15h 26m
2020-06-29
2020-06-30
13h 57m
2020-06-26
2020-06-29
3d 3h 42m
2020-06-16
2020-06-24
8d 6h 54m
2020-06-09
2020-06-09
13h 2m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2021-01-11
Enter
Bosphorus Bridge 1
2021-01-08
Enter
Bosphorus Bridge 2
2021-01-08
Enter
Bosphorus Bridge 2
2020-06-30
Leave
Bosphorus Bridge 1
2020-06-30
Leave
Bosphorus Bridge 1
2020-06-26
Enter
Bosphorus Bridge 2
2020-06-26
Enter
Note: All times are in UTC

Latest news

picture from Beaching

Sat Feb 13 15:37:16 CET 2021 BerndU

Picture from Aliaga 2021 https://www.instagram.com/p/CLOE8nRLpde/

Beached

Thu Jan 14 16:39:50 CET 2021 BerndU

Beached at Aliaga 14.01.21

Water ingress off Burgas

Sun Aug 02 16:46:29 CEST 2020 Timsen

The 'Deniz 5', enroute from Constanta, suffered water ingress in in its forepeak tank and cargo hold No. 2 and listed heavily in pos. 42 28 03 N, 027 28 54 E, approximately 30 nautical miles east of town of Obzor in Bulgarian waters northeast of Burgas, on July 31, 2020. The ship developed a portside list. On July 31 the ship was under tow to Burgas. On Aug 1 at 2.50 a.m. it was towed to Burgas anchorage. Upon completion of formalities, the vessel was berthed at the repair yard in the port. A detailed damage survey was carried out by the attended surveyors together with the owner's superintendent. Divers carried out an underwater inspection of the vessel. Part of the cargo was discharged and shifting operations were carried out in order to stabilize the vessel. Temporary repairs were carried out by shore based technical teams with the support of the crew. A tightness test will also be conducted upon completion of further repairs. The vessel remained stationary at the inner port as of Sep 9.Disputes between cargo interests and owners have been reported regarding water ingress and deviation to the port of Burgas.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data