CRYSTALWATER
Course/Position
Latest ports
Latest Waypoints
Latest news
Tanker sailing again 20 months after accident
The former "Hordafor V" sailed from Gdynia on Dec 25, 2018, 20 months after the floating dock in which she was under maintenance capsized at the Nauta Repair Shipyard. The ship meanwhile was renamed "Crystalwater" and was headed to Tallinn, ETA Dec 28, 11 a.m.
Floating dock with tanker capsized and sank
On Apr 27, 2017, the "Hordafor V" capsized at the Nauta Repair Shipyard in Gdynia after the floating dock No. 1 inside which the ship was under repair rolled over at 1:30 p.m. No one was injured, and immediate action was taken to evacuate the crew and secure the site. The Port Fire Brigade has been involved in rescue operations and laid out oil booms. A team of divers inspected the site. Reports with photos and video: Http://www.trojmiasto.pl/entertainment/catch-watch-the-cookies-with-the-with-the-with-the-dogs-n112371.html#tri http://www.bt.no/nyheter/utenriks/Austevoll-bat-kantret-ved-dokk-i-Polen-333820b.html
Upload News