General information

IMO:
9400473
MMSI:
305200000
Callsign:
V2DV7
Width:
25.0 m
Length:
162.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
75.7° / 1.0
Heading:
75.0° / 1.0
Speed:
Max speed:
Status:
moving
Area:
South China Sea
Last seen:
2024-12-21
1 day ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 day ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-15
2024-12-21
6d 5h 46m
2024-12-05
2024-12-07
1d 19h 10m
2024-10-21
2024-10-30
8d 23h 50m
2024-10-15
2024-10-16
1d 7h 30m
2024-10-04
2024-10-14
10d 10h 18m
2024-09-22
2024-10-04
11d 22h 56m
2024-09-18
2024-09-20
2d 7h
2024-09-08
2024-09-12
4d 6h 59m
2024-08-18
2024-08-23
4d 18h 40m
2024-08-07
2024-08-11
4d 5h 18m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hong Kong Approach
2024-12-21
Enter
Hong Kong Approach
2024-12-15
Leave
Kukup Island
2024-12-05
Leave
Cape Town
2024-11-18
Enter
Canary Islands
2024-11-04
Enter
Selsey
2024-10-30
Enter
Portsmouth Approach
2024-10-30
Enter
Note: All times are in UTC

Latest news

Combi Lift signs contract with Schenker for two ships for Gorgon LNG project

Wed Jan 11 12:51:25 CET 2012 arnekiel

Combi Lift said it has signed a contract with Schenker for two of their semisubmersible ships for the Gorgon LNG project. The duration of the contract is 1 year with option of 2 years for delivery of supplies to the start-up of the project on Barrow Island in the western part of Australia. More at http://worldmaritimenews.com/archives/43701

Dockwise completes complex boat transport operation in Phuket

Fri Nov 04 08:11:18 CET 2011 arnekiel

Dockwise Yacht Transport (DYT) completed its most complex lift-on/lift-off procedure to date using the 532-foot (162.3 meters) transport vessel Combi Dock 1, owned by Combi Lift, which left Genoa, Italy on 7 October and arrived safely in Phuket, Thailand on 28 October with seven yachts aboard, including five motor yachts over 100-feet (30.5-meters) in length and a 95-foot (29-meter) catamaran with a 41-foot (12.6-meter) beam. Report with photos at http://www.sail-world.com/Europe/DYT-completes-complex-operation-in-Phuket/90319 and at Dockwise site http://www.yacht-transport.com/page/dytlatest/smooth-operating-in-the-most-com.html

Drill machine for new miami port tunnel arrives

Fri Jun 24 09:41:37 CEST 2011 arnekiel

The $45-million German-built massive machine that will drill a tunnel to the Port of Miami arrived Thursday evening aboard Combi Dock I, so big it came packed in separate pieces inside large boxes and crates. Arrival of the machine marked the most important milestone in the $1 billion project since the Florida Department of Transportation and the private tunnel builder, Miami Access Tunnel, struck a final agreement in late 2009. “This is a monumental day for the people of Miami-Dade County,” said Ric Katz, a spokesman for the Florida Department of Transportation (FDOT), who watched the arrival of the container ship Combi Dock 1 from South Pointe Park in South Beach. “This is the arrival of the tunnel boring machine that will, when assembled, build this important tunnel that will connect Watson Island with Dodge Island, our seaport, this county’s second most important economic generator.” Report with video http://www.miamiherald.com/2011/06/23/2281986/machine-to-drill-port-of-miami.html?asset_id=Tunnel%20boring%20machine%20arrives&asset_type=html_module

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data