General information

IMO:
9346689
MMSI:
305329000
Callsign:
V2QJ5
Width:
15.0 m
Length:
90.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
137.9° / 0.0
Heading:
205.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Ashdod (Asdod Port Terminal)
Area:
Mediterranean Sea
Last seen:
2024-12-22
5 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
11 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-22
53m
2024-12-11
2024-12-14
3d 7h 33m
2024-12-03
2024-12-10
7d 4h 53m
2024-11-13
2024-11-15
2d 6h 25m
2024-11-09
2024-11-13
3d 16h 53m
2024-11-05
2024-11-08
2d 18h 51m
2024-11-01
2024-11-04
3d 7h 2m
2024-10-29
2024-10-30
1d 9h 22m
2024-10-19
2024-10-19
12h 7m
2024-09-29
2024-10-01
1d 12h 12m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kreta
2024-12-19
Enter
Pantelleria East
2024-12-17
Enter
Sizilien
2024-12-17
Enter
Sizilien
2024-12-02
Leave
Pantelleria West
2024-11-30
Enter
Pantelleria West
2024-11-25
Leave
El-Jazair
2024-11-21
Leave
Note: All times are in UTC

Latest news

Work accident in Volos

Fri Sep 07 18:43:42 CEST 2018 Timsen

Aboard the "Blue Antares" which was berthed in Volos on Sep 6, 2018, a 55-year-old docker was injured while loading a ferrocar. The worker was in the cargo hold when he fell and was injured at the fingers of the right hand, theright shoulder and head. An ambulance took him to the General Hospital of Volos. A preliminary investigation was carried out by the Central Port Authority of Volos.

Technical failure at Gemlik

Tue Jun 12 13:37:42 CEST 2018 Timsen

The "Blue Antares" suffered a technical failure at Gemlik on June 4, 2018, The vessels departure permission has been cancelled by the Harbour Master untilthe completion of permanent repairs. A state surveyor attended on board in order to verify the final repair status. Repairs were carried out by the crew. The vessel sailed on June 6 at 6.30 p.m. and headed to Novorossiysk, where it arrived on June 10 at 10 p.m. before sailing further to Nemrut, ETA June 15.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data