General information

IMO:
9285213
MMSI:
257684000
Callsign:
3YLF
Width:
16.0 m
Length:
95.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
250.6° / -9.0
Heading:
251.0° / -9.0
Speed:
Max speed:
Status:
moving
Area:
Norwegian Sea
Last seen:
2024-11-24
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-23
2024-11-23
6h 19m
2024-11-22
2024-11-23
16h 59m
2024-11-21
2024-11-21
2h 36m
2024-11-21
2024-11-21
11m
2024-11-21
2024-11-21
11m
2024-11-20
2024-11-20
4h 2m
2024-11-20
2024-11-20
4h 42m
2024-11-18
2024-11-20
1d 5h 16m
2024-11-18
2024-11-18
12h 25m
2024-11-17
2024-11-17
6h 45m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Skagen
2022-01-28
Leave
Läsö DK
2022-01-28
Leave
Anholt
2022-01-28
Leave
Kalundborg
2022-01-27
Leave
Kalundborg
2022-01-27
Enter
Anholt
2022-01-26
Enter
Läsö DK
2022-01-26
Enter
Note: All times are in UTC

Latest news

Bergen Tankers converts the tanker to run on LNG-powered engines

Sat Sep 13 12:24:17 CEST 2014 arnekiel

Bergen Tankers AS (Norway) is converting the Lloyd’s Register-classed chemical and product tanker Bergen Viking to run on two Bergen C26:33L6AG LNG-powered engines, replacing the current diesels. The project also includes the LNG fuel containment system, ACON LNG fuel, the safety control system and all engineering required by Class and National, the company said in its press release. The vessel conversion will encompass the removal of 4 diesel generating sets and the installation of 2 new natural gas (NG) fuelled generating sets, delivered by Bergen Engines AS. The conversion includes also two150 m3 LNG tanks of IMO type C, installed on open deck. ‘The service department of Croon Marine & Offshore has received the order from Bergen for the upgrade and modification of the Machinery Control and Monitoring and Power Management System on board the ship “Bergen Viking”. The system delivery will be in 2014, the execution March 2015.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data