General information

IMO:
9001136
MMSI:
511100568
Callsign:
T8A3731
Width:
16.0 m
Length:
114.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Palau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
5.6° / 0.0
Heading:
348.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Black Sea
Last seen:
2025-04-21
4 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-03-31
2025-04-05
4d 22h 5m
2025-03-19
2025-03-27
8d 53m
2025-03-13
2025-03-15
1d 3h 17m
2025-03-07
2025-03-08
1d 3h 46m
2025-02-15
2025-02-15
6h 22m
2025-01-21
2025-01-22
3h 11m
2024-12-31
2025-01-07
6d 20h 22m
2024-12-07
2024-12-08
3h 35m
2024-11-30
2024-11-30
9h 48m
2024-11-22
2024-11-26
3d 19h 8m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2025-04-05
Leave
Bosphorus Bridge 1
2025-04-05
Leave
Bosphorus Bridge 1
2025-03-13
Enter
Bosphorus Bridge 2
2025-03-13
Enter
Bosphorus Bridge 2
2025-03-08
Leave
Bosphorus Bridge 1
2025-03-08
Leave
Bosphorus Bridge 1
2025-01-21
Enter
Note: All times are in UTC

Latest news

Detention in Karasu

Tue Apr 22 09:38:49 CEST 2025 Timsen

On April 13, 2025, the 'Able' was detained in Karasu with 16 deficiencies: 1) Living and working - Dirty, parasites Not hygienic 2) Living and working - Gas instruments Not as required 3) Living and working - Lighting (working spaces) Not as required 4) Living and working - Pipes, wires (insulation) Not as required 5) Certificate & Doc - Log books, compulsory entries Entries missing 6) Certificate & Doc - International Sewage Pollution Prevention Certificate Not as required 7) Certificate & Doc - International Oil Pollution Prevention Cert Missing 8)) Certificate & Doc - Oil record book Not as required 9) Life saving Appliances - Lifeboats Not properly maintained 10) Propulsion and auxiliary machinery - Other (Machinery) Other 11) Fire safety - Fire pump and its pipes Inoperative 12) Structural conditions - Decks - Corrosion Corroded 13) Structural conditions - Hull - Corrosion Corroded 14) Structural conditions - Ballast, fuel and other tanks Not as required 15) Structural conditions - Closing devices / Watertight doors Damaged 16) Structural conditions - Electrical installations in general Not as required The vessel was released again on April 18 and left the port en route to Sulina with an ETA as of April 21. https://www.facebook.com/profile.php?id=100063576908591

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data