Eckernfoerde (Port)
Moored Vessels
Latest news
Sunken two masted vessel raised
The wreck of the sunken "Ninive" was pumped out on Jan 28, 2015, by forces of the THW and the "Stadtwerke". Draining works started at 2 p.m. , and a tractor pulled the galeas upright with a towing wire at the mast. Around 4 p.m. the THW arrived with 17 men and eight more mobile pumps with a capcity of 6000 liters per minute each. At 5.15 p.m. the ship which sank in the night of Jan 21, was floating again. German reports with photos and video: http://www.shz.de/lokales/eckernfoerder-zeitung/pumpen-grosseinsatz-auf-der-gehobenen-ninive-id8815331.html http://highwaynews.de/2015/01/23/fl-eckernfoerde-pressemitteilung-aus-dem-wasserschutzpolizeirevier-flensburg/
Eckernfoerde
The harbour of Eckernfoerde and the bight are ice free. www.bsh.de
Eckernfoerde
In the harbour of Eckernfoerde very open 10-15 cm thick ice, the Eckernfoerde Bight is ice free. www.bsh.de
Upload News