General information

Name:
Lembar
Country:
Indonesia
UN/Locode:
Local time:
Moored Vessels:
0
Expected Vessels:
12
Berths:
1
Coordinates:
S 08° 44' E 116° 04'

Moored Vessels

Name
Type
Moored

Expected Vessels

Name
Type
Expected
Passenger Ship
29.12. 08:00
Passenger Ship
29.12. 10:00
Passenger Ship
29.12. 17:00
Passenger Ship
29.12. 20:00
Passenger Ship
22.04. 05:30

Sailed Vessels

Name
Type
Sailed

Latest news

Pelindo III to Build Cruise Port in West Lombok

Tue Sep 06 07:06:54 CEST 2016 arnekiel

TEMPO.CO, Jakarta - State-owned port operator PT Pelabuhan Indonesia III (Persero) will soon build a new port in West Lombok, West Nusa Tenggara, called Gili Mas New Port, located not far from Lembar Port. Cruise ships are expected to dock at the port by 2018. “This year alone, 13 cruise ship have visited Lembar Port,” Public Relations Manager of PT Pelindo III Edi Priyanto told Tempo at his office, Monday, September 5, 2016. In 2016, some 18 cruise ships are scheduled to dock at Lembar Port. West Lombok has seen an upward trend of cruise ship arrivals year over year. “We expect to see a high number of cruise ship passenger arrivals this year. Many ships will arrive directly from Australia,” Edi said. Therefore, the Gili Mas New Port construction is imperative to meet the need for passenger services. Previously, passengers of cruise ships docking at Lombok must be carried by boats to reach the shore because Lembar Port has a depth of less than -10 LWS (Low Water Spring). Unlike the Lembar Port, Gili Mas Port has -16 to -18 LWS depth, allowing large cruise ships to directly disembark the passengers. “Aside from passenger terminal, we will also build a container terminal.” http://en.tempo.co/read/news/2016/09/06/056801949/Pelindo-III-to-Build-Cruise-Port-in-West-Lombok

Upload News

This port is not covered

We are always looking for new partners to host our AIS receivers and improve the vesseltracker.com service.

Become an antenna partner