Amrum

General information

Name:
Amrum
Country:
Germany
UN/Locode:
DESDD
Local time:
Moored Vessels:
5
Expected Vessels:
0
Berths:
1
Coordinates:
N 54° 38' E 008° 23'

Moored Vessels

Name
Type
Moored
Unclassified
23.10. 18:00
Coast Guard Ship
30.10. 12:21
Rescue Vessel
30.10. 11:33
Unclassified
04.11. 16:30

Expected Vessels

Name
Type
Expected

Sailed Vessels

Name
Type
Sailed

Latest news

E.ON reaches major milestone in North Sea project - First turbine installed at Amrumbank West offshore wind farm

Sat Feb 14 11:10:59 CET 2015 arnekiel

After a construction period of one year, E.ON’s Amrumbank West offshore project is taking shape. E.ON has annonced that the first of 80 turbines was successfully installed at the construction site, 35 kilometers to the north of the island of Helgoland. Scheduled for completion in the autumn of 2015, the Amrumbank West wind farm will have a total capacity of 288 megawatts -- enough energy to supply electricity to as many as 300,000 households. According to E.ON, this will help to cut over 740,000 tonnes of carbon emissions annually. Capital expenditures on the project will be total about €1 billion. Some details about the project: The hub height of the 3.6 megawatt turbine manufactured by Siemens is 90 meters above water level; the rotor diameter is 120 meters, with the rotor tip height measuring 150 meters, Carrier vessels transport the components of 7 turbines from the Port of Esbjerg in Denmark to the deep-sea construction site Amrumbank West. To reduce transit times from the base ports of Esbjerg, Helgoland or Cuxhaven to the wind farm, E.ON has chartered a hotel ship. Immediately after the installation of the components, the turbines are prepared for operation. At the same time, commissioning work is being carried out on the transformer substation of the Amrumbank West wind farm. “We are confident that we will soon be able to feed electricity generated by the first turbines into the public grid as planned”, said Dominik Schwegmann, lead project manager of Amrumbank West. The operation and maintenance of the wind farm will be managed from Helgoland. For this purpose, E.ON has built an operations and maintenance base on the island. http://www.renewableenergyfocus.com/view/41410/e-on-reaches-major-milestone-in-north-sea-project/

Upload News