Allgemeine Informationen

IMO:
9479785
MMSI:
244820283
Rufzeichen:
PCYP
Breite:
11.0 m
Länge:
26.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tug
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
137.0° / 0.0
Kompasskurs:
305.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
NORTH ATLANTIC OCEAN
Zuletzt empfangen::
2024-12-21
vor 1 Tag
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-12-20
2024-12-20
7h 16m
2024-12-19
2024-12-19
6h 52m
2024-12-18
2024-12-18
10h 42m
2024-12-16
2024-12-17
5h
2024-12-16
2024-12-16
1h 5m
2024-12-15
2024-12-15
1h 58m
2024-12-13
2024-12-13
2h 30m
2024-12-12
2024-12-13
5h 38m
2024-12-08
2024-12-08
1h 21m
2024-12-03
2024-12-05
1d 14h 51m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Colon Approach
2021-04-08
Abfahren
Gatun Locks
2021-04-08
Abfahren
Pedro Miguel Locks
2021-04-08
Abfahren
Miraflores Locks
2021-04-08
Abfahren
Puente de las Americas
2021-04-08
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Two crew members medevaced after accident off Neeltje Jans

Tue Jan 01 23:23:22 CET 2013 Timsen

Two crew members of the "Yogi" were injured in an anccident on Jan 1, 2013, at 4.35 a.m. and had to be medevaced the crew of the KNRM-boat "Koopmansdank" of the Station Neeltje Jans. A connector had come loose from the anchor chain of the Multicat and hit the 2 victims. A third man remained unharmed. The KNRM-boat was on scene 30 minutes later and in waves up to 2 meters, ambulance staff was transferred onto the "Yogi" first. One man had suffered broken toes. The second had a double fracture at one leg. The lifeboat took the two on board. Upon arrival at the port of Neeltje Jans they were transferred to a waiting ambulance and taken the hospital for further treatment. Dutch report with photos: http://www.knrm.nl/service/reddingrapporten/?contentID=6BA4ACB1

YOGI 9479785

Tue Dec 04 09:38:17 CET 2012 Timsen

In the evening of Dec 3, 2012, both rescue stations on Terschelling were alerted after the "Yogi" encountered problems with a towage. Earlier in the day, the "Yogi" and a tug had been working jointly on a 200 meter ling pipeline when the tug got its propeller fouled by the towing cable. The salvage company Noordgat was called to take the tug tug to Terschelling, while the Yogi" continued to drag the pipeline alonge. But later in the evening, the "Yogi" itself got problems with the pipeline, and the crew decided to cut the towing line. But something went wrong, and the cable remained got stuck in the rudder of the "Yogi". The "Yogi" was hampered in maneuvering by this and in danger of drifting aground on the Gronden in northwesterly wind of 7/8 bf. The lifeboats "Arie Visser" and "Frans Hogewind" were alarmed and both quickly on the spot. Short time later the "Yogi" reported that it freed itself from the tow and would, after controlling the damage caused, continue towards the harbor. The "Frans Hogewind" returned to its station, while the "Arie Visser" remained on standby until it was ensured that the "Yogi" had not suffered serious damage. Half an hour later the crew reported that the situation was under control and they would now start looking for the lost pipeline, and the "Arie Visser" also returned to its station.

Crane barge ran on rocks off Brehat

Fri Jun 22 11:30:16 CEST 2012 Timsen

On June 22. 2012, around 3:00 a.m. the "Yogi" struck a rock off the east coast of the island of Brehat. The grounding caused a leak under the pontoon crane. The MRCC Corsen, which was alerted by the semaphore of Saint-Quay Portrieux, dispatched a boat of the SNSM Loguivy with two dewatering pumps on board. As a precaution, the pontoon crane laid out an anti-pollution barrier as one of its tanks containing diesel had suffered a small leak. A Cayman helicopter of the Navy was dispatched which hoisted a team of Brest naval firemen and two additional motor pumps onto the ship. Around 8:00 a.m. the situation was under control, and the Yogi proceeded to the Port of Saint-Quay-Portrieux escorted by the SNSM-boat from Saint-Quay Portrieux. The "Yogi" and the barge"Stemat 89 as well as the tug "Dutch Power" are laying out submarine cables for the windfarm off Bréhat since early June. Photo report: http://www.premar-atlantique.gouv.fr/galeries/Ponton-grue-Yogi

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data