Allgemeine Informationen

IMO:
MMSI:
244670338
Rufzeichen:
PF7702
Breite:
6.0 m
Länge:
24.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
272.4° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Belgium
Zuletzt empfangen::
2025-02-02
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-01-27
5d 10h 39m
2025-01-27
2025-01-27
1h 14m
2025-01-27
2025-01-27
2h 56m
2025-01-21
2025-01-23
1d 18h 53m
2025-01-21
2025-01-21
1h 50m
2025-01-14
2025-01-21
6d 16h 15m
2025-01-14
2025-01-14
8h 26m
2024-12-16
2024-12-17
15h 56m
2024-10-17
2024-10-17
13m
2024-10-16
2024-10-17
10h 58m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Kallo Locks
2025-01-31
Abfahren
Kallo Locks
2025-01-29
Ankommen
Antwerp Doel
2025-01-27
Ankommen
Antwerp
2025-01-27
Ankommen
Nauw van Bath
2025-01-27
Abfahren
Hans Weert
2025-01-27
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Gouwe free again

Thu Apr 23 10:16:15 CEST 2015 Timsen

The "Valk" pushed away the barge which had been stuck under the lift bridge in Waddinxveen in the night to Apr 23, 2015. Also the middle section of the bridge was removed by cranes so that repairs could be started. It was expected that the Gouwe would be re-opened for ship traffic around noon. Pedestrians were offered a ferry boat for the crossing. Dutch report with video: http://nos.nl/artikel/2031908-vastgelopen-schip-waddinxveen-weggehaald.html

Steel pillar got stuck under bridge

Wed Apr 22 09:08:52 CEST 2015 Timsen

Ship traffic on the Gouwe was obstructed in the afternoon of Apr 21, 2015, after a barge being pushed by the "Valk" allided with the lift bridge in Waddinxveen. The skipper of the ship suffered slight injuries when being hit by metal parts as the barge got stuck under the bridge with one of its two pillars. He was checked by medicals and could return to work. A safety zone was established as the middle section of the bridge had become unstable. Traffic on the N207 between Alphen and Gouda was hampered. The road was expected to remain closed until Apr 22 at 3:00 p.m. in both directions for the necessary repairs with a crane. Dutch reports with photos and video: http://www.totaaltrans.nl/werkschip-raakt-hefbrug-met-spudpaal-gouwe-gestremd/ http://www.nu.nl/binnenland/4035077/hefbrug-waddinxveen-paar-dagen-gestremd-aanvaring-schip.html#aanvaring-schip-in-waddinxveen-2

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data