Allgemeine Informationen

IMO:
8922254
MMSI:
341739001
Rufzeichen:
V4DR6
Breite:
13.0 m
Länge:
88.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Saint Kitts and Nevis
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
280.0° / 0.0
Kompasskurs:
280.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Dakar (Mole 2 Terminal)
Gebiet:
NORTH ATLANTIC OCEAN
Zuletzt empfangen::
2024-11-22
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-20
1d 3h
2024-11-15
2024-11-16
5h 17m
2024-11-02
2024-11-04
1d 20h 35m
2024-10-13
2024-10-14
1d 2h 36m
2024-10-04
2024-10-11
6d 15h 54m
2024-09-12
2024-09-16
4d 7h 27m
2024-08-11
2024-09-12
31d 21h 36m
2024-08-08
2024-08-09
18h 39m
2024-07-21
2024-07-22
1d 5h 4m
2024-06-28
2024-07-11
12d 12h 47m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Canary Islands
2024-11-15
Ankommen
Strait of Gibraltar
2024-11-12
Ankommen
Isla de Alboran
2024-11-12
Abfahren
El-Jazair
2024-11-11
Ankommen
Pantelleria East
2024-11-08
Abfahren
Sizilien
2024-11-08
Abfahren
Pantelleria East
2024-10-28
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Ship disabled off Liepaja

Sun Nov 11 18:00:03 CET 2018 Timsen

On Nov 8, 2018, the "Strami" lost power soon after its departure from Liepaja, where she had berthed on Nov 6,, coming from Teignmouth. The disabled ship was towed back to port by the tug "TAK-5" and was berthed in port at 3.40 p.m. The ship left Lipeaja again on Nov 19 at 11.50 a.m., bound to Ellermere, ETA Nov 25. Photo: http://www.shipspotting.com/gallery/photo.php?lid=2934151

Allision in Kiel

Thu Mar 11 09:26:03 CET 2010 Timsen

On Mar 10, 2010, at 10.30 a.m. the "Strami" allided with a crane of the power station at Kiel while berthing with a cargo of coal from Sczeczin. The crane was damaged and had to be taken out of service until it has been surveyed by two experts. The amount of damage was to be assessed yet. The "Strami" remains in Kiel.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data