Allgemeine Informationen

IMO:
9469388
MMSI:
244513000
Rufzeichen:
PHJU
Breite:
27.0 m
Länge:
212.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
219.5° / 0.0
Kompasskurs:
143.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Immingham (North Haven Ro-Ro Terminal)
Gebiet:
North Sea
Zuletzt empfangen::
2024-11-05
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 9 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-05
8h 44m
2024-11-04
2024-11-04
11h 49m
2024-11-03
2024-11-03
13h 23m
2024-11-02
2024-11-02
10h 41m
2024-11-01
2024-11-01
14h 55m
2024-10-31
2024-10-31
11h 45m
2024-10-30
2024-10-30
13h 52m
2024-10-29
2024-10-29
11h 57m
2024-10-28
2024-10-28
13h 52m
2024-10-27
2024-10-27
11h 13m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Humber entrance
2024-11-05
Abfahren
Hook of Holland
2024-11-04
Abfahren
Hook of Holland
2024-11-04
Ankommen
Humber entrance
2024-11-03
Ankommen
Humber entrance
2024-11-03
Abfahren
Hook of Holland
2024-11-02
Abfahren
Hook of Holland
2024-11-02
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Fire on ferry off Grimsby

Sat Jun 20 15:52:17 CEST 2015 Timsen

On June 19, 2015, at 9.26 p.m. the lifeboat "Pride of the Humber" from Humber RNLI were tasked by the HM Coastguard to go and stand by the "Stena Transit" which was suffering an engine room fire. The vessel had 180 persons on board so the lifeboat made best speed to its location anchored in the shipping channel just off Grimsby. Once on scene the lifeboat made preparations in case an evacuation was necessary. All persons on board were accounted for and the vessels own engineers were investigating if the fire was extinguished. Two tug boats from Immingham were also sent to the scene while the Coastguard constantly liaised with the vessel on any developments. It was established that the fire had been extinguished and nobody was in need of any medical assistance. The tug boats and lifeboat still stood by while the vessels crew ventilated the area and could asses if there was any damage; they could then potentially get their systems up and running again. After approximately 1,5 hours the lifeboat was stood down from the scene. The ferry which was coming from Rotterdam, berthed in Immingham on June 20 at 7.20 a.m. Report with video: http://rnli.org/NewsCentre/Pages/Humber-lifeboat-launched-to-ferry-fire1.aspx

New Stena ferry currently on sea trials, delivery mid of september

Thu Sep 01 10:12:39 CEST 2011 arnekiel

The new STENA TRANSIT is currently being outfitted at the Samsung Heavy Industrie Yard in Geoje Korea and is performing sea trials, the delivery of the new ro-ro ferry is scheduled for half September, when the vessel will set sail for Europe with a stop over in Singapore for fuel. Source: Maritime Press Clippings

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data