SHINNECOCK BELLEverschrottet
Kurs/Position
vor 2857 Tagen
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Broken up
Broken Up (since 18/01/2013)
sold to breakers
sold to breakers
Detained in Port of Tyne for twenty days
The vessel was detained in Tyne because the number and nature of the deficiencies identified are objective evidence of a serious failure or lack of effectiveness of the ISM code, the port forward and starboard aft davits heads fall block were corroded through and repaired with tape, the fibreglass thwarts of the port and starboard lifeboat was cracked through into the buoyancy chambers. Other deficiencies identified included: the funnel door was corroded through; there was a railing missing at deck end by the provision crane; the breathing apparatus (BA) set at the fire station in foscle is leaking at the pressure gauge; and the galley (washing) sink has no water. The vessel was released from detention at 14 December 2011
News schreiben