Allgemeine Informationen

IMO:
MMSI:
Rufzeichen:
D5FP6
Breite:
19.0 m
Länge:
113.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
46.7° / 3.0
Kompasskurs:
46.0° / 3.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
Bight of Benin
Zuletzt empfangen::
2017-06-08
vor 2727 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3365 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2017-05-30
2017-06-08
8d 5h 58m
2017-04-09
2017-04-19
9d 15h 8m
2017-03-28
2017-04-07
9d 22h 44m
2015-09-09
2015-09-18
9d 2h 22m
2015-09-01
2015-09-09
8d 4h 9m
2015-07-08
2015-07-14
5d 23h 5m
2015-06-30
2015-07-02
1d 22h 34m
2015-06-17
2015-06-23
6d 2h 9m
2015-06-01
2015-06-03
1d 21h 53m
2015-05-25
2015-05-25
21h 13m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Detained by MCA for 6 days in March/April at Silvertown

Fri May 17 09:36:24 CEST 2013 arnekiel

Date and Place of detention: - 28 March 2013, Silvertown The vessel was detained in Silvertown as the load lines (including Exemption) was not filled in for annual survey and eleven deficiencies were marked as ISM, which demonstrate there was objective evidence of a serious failure, or lack of effectiveness of the implementation of the ISM Code. The ISM deficiencies included several life fire fighting related deficiencies as numerous internal fire doors not closing properly; unable to open the fire hose box and one fire hose was leaking. Breathing apparatus sets had empty bottles along with one set having a low alarm inoperative, one set an air leak and EEBD set was undercharged. During the fire drill crew entered fire with empty bottles and the hose was too short; the crew lacked familiarity when operating GMDSS equipment. There was a lack of cleanliness in the galley and nautical publications had not been updated. Other deficiencies identified were sounding pipes on the main deck and engine room springs were seized; the ventilator was holed in the foscle; hydraulic controls were leaking on to the main deck and flanges on aux engine turbo chargers were exposed. The hot water pipes in the staff accommodation needed insulating along with the shower mixes being put in working order. The voyage data recorder was unable to be switched on and the long range identification and tracking system was inoperative. The vessels International Anti-fouling- System certificate, oil record book SOLAS number one poster and records of rest were incomplete. The vessel was released on 02 April 2013

Detention in Silvertown

Wed Apr 17 09:01:06 CEST 2013 Timsen

The "San Remo II" was detained in Silvertown on Mar 28, 2013, as the load lines (including Exemption) was not filled in for annual survey and eleven deficiencies were marked as ISM, which demonstrate there was objective evidence of a serious failure, or lack of effectiveness of the implementation of the ISM Code. The ISM deficiencies included several life fire fighting related deficiencies as numerous internal fire doors not closing properly; unable to open the fire hose box and one fire hose was leaking. Breathing apparatus sets had empty bottles along with one set having a low alarm inoperative, one set an air leak and EEBD set was undercharged. During the fire drill crew entered fire with empty bottles and the hose was too short; the crew lacked familiarity when operating GMDSS equipment. There was a lack of cleanliness in the galley and nautical publications had not been updated. Other deficiencies identified were sounding pipes on the main deck and engine room springs were seized; the ventilator was holed in the foscle; hydraulic controls were leaking on to the main deck and flanges on aux engine turbo chargers were exposed. The hot water pipes in the staff accommodation needed insulating along with the shower mixes being put in working order. The voyage data recorder was unable to be switched on and the long range identification and tracking system was inoperative. The vessels International Anti-fouling- System certificate, oil record book SOLAS number one poster and records of rest were incomplete. The ship left England on Apr 3 bound for Rouen and Dakar where it berthed on Apr 17.

SAN REMO II

Fri Dec 31 18:24:29 CET 2010 Timsen

On Dec 29, 2010, at 2.30 a..m. on the Westerscheldt the Malta-flagged "Ufa" and the "San Remo II" were in collision in dense fog. The "San Remo II" was underway from the Terneuzen locks to Wielingen without cargo when it was hit by the "Ufa" which came from Antwerp and was underway towards the East gat. The latter suffered damages on six metres length at the starboard bow, the unloaded vessel a holed ballast water tank and a damage of one metre length six metres above the water line on port side. Both ships anchored off Flushing for inspections.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data