Allgemeine Informationen

IMO:
9788083
MMSI:
235117926
Rufzeichen:
2JPU3
Breite:
11.0 m
Länge:
41.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
High-Speed Craft
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
102.0° / 0.0
Kompasskurs:
285.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Cowes (Cowes Port)
Gebiet:
United Kingdom
Zuletzt empfangen::
2024-11-16
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-10
6d 8m
2024-11-10
2024-11-10
10h 33m
2024-11-09
2024-11-10
11m
2024-11-09
2024-11-09
32m
2024-11-09
2024-11-09
12m
2024-11-09
2024-11-09
31m
2024-11-09
2024-11-09
13m
2024-11-09
2024-11-09
16m
2024-11-09
2024-11-09
11m
2024-11-09
2024-11-09
15m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Fawley Approach
2024-11-10
Ankommen
Southampton Approach
2024-11-10
Ankommen
Southampton Approach
2024-11-10
Abfahren
Fawley Approach
2024-11-10
Abfahren
Fawley Approach
2024-11-09
Ankommen
Southampton Approach
2024-11-09
Ankommen
Southampton Approach
2024-11-09
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Several sailings cancelled due to technical issues

Fri Apr 26 10:37:35 CEST 2024 Timsen

Red Funnel has been forced to cancel eight of its hi-speed Red Jet sailings on April 25, 2024, due to technical issues. In the early afternoon the coolant pump of the 'Red Jet 6' failed, which resulted in the cancellation of the 12:40 p.m. sailing from Southampton and the departure at 1:15 p.m. from West Cowes. Also the 3:35 p.m., 4:45 p.m. and 5:55 p.m. departures from Southampton and the 4:10 p.m., 5:20 p.m. and 6:30 p.m. sailings from West Cowes have all been pulled. The ship left Southampton again on April 26 at 8.20 a.m. and arrived in Coews at 8.40 a.m.

Disruptions to continue for several days

Tue Mar 19 11:37:56 CET 2024 Timsen

Disruptions on Red Funnel's Red Jet service were to continue until at least March 22. A replacement vessel of Blue Funnel was running in its place but journeys are taking up to 50 minutes, as opposed to the usual 28 minutes. Red Funnel was to run three extra sailings from both Southampton and Cowes at peak times after a water jet issue was reported with the 'Red Jet 6' and a technical issue with the starboard jet room on the 'Red Jet 7'. The 'Red Jet 6' was docked in Southampton, alongside the 'Red Jet 4', while the 'Red Jet 7' was sent to the Wight Shipyard, East Cowes. Repairs to the 'Red Jet 7's jet propulsion system were underway. Red Jet crossings - March 19 to March 22: Departing Southampton: 05:30 / 06:40 / 07:50 / 09:00 / 10:20 / 11:30 / 12:40 / 13:50 / 15:00 / 16:10 / 17:20 / 18:30 / 19:40 / 21:05 / 22:30 Departing West Cowes: 06:05 / 07:15 / 08:25 / 09:35 / 10:55 / 12:05 / 13:15 / 14:25 / 15:35 / 16:45 / 17:55 / 19:05 / 20:15 / 21:40 / 23:05 Additional Blue Funnel crossings: Departing Southampton: 07:30 / 09:50 / 16:50 Departing West Cowes: 06:30 / 08:50 / 15:50

Red Jet service suspended due to technical issue

Mon Mar 18 10:14:24 CET 2024 Timsen

On March 16, 2024, the Isle of Wight to Southampton Red Jet service has been suspended. Initially the service had been running a revised timetable due to a water jet issue on the 'Red Jet 6'. However, the operator has confirmed its Red Jet services have now been suspended following an issue with the 'Red Jet 7' regarding the starboard side jet room. The Red Jet sailings at 10.20 a.m. from Southampton and 10.55 a.m. from Cowes were cancelled due to the same technical issue.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data