Allgemeine Informationen

IMO:
8863355
MMSI:
511100307
Rufzeichen:
T8A3421
Breite:
17.0 m
Länge:
138.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Palau
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
62.9° / 0.0
Kompasskurs:
60.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Black Sea
Zuletzt empfangen::
2024-11-27
vor 26 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 26 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-19
2024-11-22
2d 15h 47m
2024-11-13
2024-11-15
1d 9h 29m
2024-10-22
2024-10-23
15h 20m
2024-10-19
2024-10-20
19h 29m
2024-09-11
2024-09-18
6d 23h 59m
2024-08-29
2024-08-30
1d 9m
2024-08-28
2024-08-28
2m
2024-08-28
2024-08-28
2m
2024-08-28
2024-08-28
5m
2024-08-28
2024-08-28
26m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-11-26
Abfahren
Bosphorus Bridge 1
2024-11-26
Abfahren
Marmara Island
2024-11-19
Abfahren
Marmara Island
2024-11-12
Ankommen
Bosphorus Bridge 1
2024-11-11
Ankommen
Bosphorus Bridge 1
2024-10-22
Abfahren
Bosphorus Bridge 1
2024-10-16
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Technical failure in Bosphorus

Sun Mar 27 19:16:58 CEST 2022 Timsen

The 'Pudozh', en route from Rostov-on-Don to Hereke, suffered a technical failure upon completion of the trasit of the Istanbul Strait and moored at Istanbul Anchorage on March 26, 2022, at 11 a.m. The crew started repairs, and the ships resumed its voyage with an ETA as of March 27.

Spare parts provided for repairs

Fri Aug 30 09:58:32 CEST 2019 Timsen

On Aug 29 a new set of spare parts was provided by the owners of the "Pudozh" for repairs at the Tuzla shipyard. The ship had suffered an engine failure at Izmail in October 2018. The tug "Horoz" had started towing the vessel to Tuzla on Apr 6. Sea trials will be carried out under the presence of class surveyor's recommendation once the repairs have been completed. As of May 24 the works were resumed by shore-based technical teams. Steel replacement in ballast tanks and cargo compartments was partly completed. The main and auxiliary engines wree being overhauled by authorised service engineers.

New set of spare parts

Sat Jun 08 19:17:07 CEST 2019 Timsen

A new set of spare parts has been provided by the owners of the "Pudozh" from the manufacturer. Repairs werestill being carried out as per class surveyor's recommendations. The vessel remained stationary in the shipyard at Tuzla on June 8.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data