Allgemeine Informationen

IMO:
MMSI:
316012342
Rufzeichen:
Breite:
14.0 m
Länge:
4.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Towing Vessel
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
198.7° / 0.0
Kompasskurs:
314.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Canada
Zuletzt empfangen::
2025-02-25
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-02-25
2025-02-25
1h
2025-02-24
2025-02-25
11h 10m
2025-02-24
2025-02-24
2h 35m
2025-02-23
2025-02-24
5h 59m
2025-02-23
2025-02-23
6h 28m
2025-02-21
2025-02-21
23m
2025-02-21
2025-02-21
5h 35m
2025-02-21
2025-02-21
4m
2025-02-20
2025-02-20
9h 34m
2025-02-19
2025-02-19
9h 39m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Uncertified master in charge

Sun Aug 07 23:31:48 CEST 2011 Timsen

The "Ken Mackenzie" had an uncertified master in charge when it hit the Queensboro rail bridge. He did not have any marine certification and is continually running boats that require certification - including the "Rustler", "Viking Monarch", "Cindy Mozel" and "Allison Nicole".

Ken Mackenzie struck bridge

Thu Jun 30 10:02:22 CEST 2011 Timsen

A gravel-loaden barge being pushed by the "Ken MacKenzie" allided with a bridge on the Fraser River in New Westminster. The ships struck a railroad bridge that connects Queensbourh to New Westminster near Vancouver east of the Queensborough Bridge on June 28, 2011, around 4:42 a.m. The pair of vessels were heading downstream when it struck the swing bridge causing damage the pivot mechanism. The bridge was stuck in open position and had to be taken out of service. River traffic was halted as the barge was kept wedged against the bridge until the bridge could be stabilized. Early reports indicated that the damage to the train bridge may be extensive, however that will be determined by the authorities conducting a thorough examination of the train bridge structure. Government authorities are conducting an investigation into the incident. Report with photo: http://www.cbc.ca/news/canada/british-columbia/story/2011/06/28/bc-new-westminster-railway-bridge.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data