Allgemeine Informationen

IMO:
8004791
MMSI:
630001006
Rufzeichen:
J5AA7
Breite:
16.0 m
Länge:
80.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Guinea-Bissau
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
246.5° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Black Sea
Zuletzt empfangen::
2024-12-25
vor 17 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 22 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-12-23
2024-12-24
1d 19h 3m
2024-12-05
2024-12-08
2d 20h 6m
2024-11-29
2024-12-03
3d 12h 56m
2024-11-17
2024-11-18
19h 51m
2024-11-11
2024-11-12
14h 46m
2024-11-09
2024-11-11
2d 15h 19m
2024-10-23
2024-10-23
1h 28m
2024-10-09
2024-10-11
1d 22h 19m
2024-10-03
2024-10-04
21h 35m
2024-09-21
2024-09-21
2h 44m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-11-15
Abfahren
Bosphorus Bridge 1
2024-11-15
Abfahren
Bosphorus Bridge 1
2024-11-07
Ankommen
Bosphorus Bridge 2
2024-11-07
Ankommen
Bosphorus Bridge 2
2024-09-21
Abfahren
Bosphorus Bridge 1
2024-09-21
Abfahren
Marmara Island
2024-09-20
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

ran aground

Mon Feb 20 18:42:24 CET 2023 BerndU

Ran aground in Varna Channel and refloated 1 hour later. 17.02.23 http://www.maritimebulletin.net/2023/02/18/cargo-ship-ran-aground-in-varna-channel/

Engine failure in Eregli

Tue Dec 17 10:40:59 CET 2019 Timsen

The 'Loyga' suffered an auxiliary engine failure along with the pertinent system at Eregli on Dec 12, 2019. Upon completion of repairs, state surveyors attended the vessel and verified the final repair status. The vessel was granted departure permission on Dec 14, and it sailed from the port the same day, arriving at Constantza on Dec 15 at 12.45 a.m.

Engine failure at Tuzla

Tue Jul 23 11:50:29 CEST 2019 Timsen

The "Loyga" suffered an engine failure at Tuzla on July 20, 2019 and permission was cancelled to leave port until the completion of repairs. The crew was carrying out repairs at Kartal Anchorage. Following the completion of repairs, the ship sailed again at 6 p.m, bound to Mariupol with an ETA as of July 26.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data