Allgemeine Informationen

IMO:
9480344
MMSI:
413464330
Rufzeichen:
BYDG
Breite:
78.0 m
Länge:
114.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Dredger
Ship type:
Flagge:
China
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Restricted movement
Kurs:
333.5° / 7.0
Kompasskurs:
19.0° / 7.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
South China Sea
Zuletzt empfangen::
2024-10-01
vor 53 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 230 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2022-04-20
2022-04-20
58m
2022-03-08
2022-04-20
42d 18h 28m
2022-02-18
2022-03-08
17d 14h 34m
2022-01-13
2022-02-18
36d 1h 25m
2021-12-29
1060d 9h 42m
2017-04-21
2017-05-28
36d 15h 54m
2016-09-11
2017-04-14
214d 16h 51m
2012-04-27
2013-01-13
260d 20h 47m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Hong Kong Approach
2022-04-30
Ankommen
Hong Kong Approach
2022-04-30
Abfahren
Hong Kong Approach
2022-04-20
Ankommen
Hong Kong Approach
2022-04-20
Abfahren
Hong Kong Approach
2022-04-20
Ankommen
Hong Kong Approach
2021-12-29
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Controversial China rig resumes work

Wed Jul 30 09:23:24 CEST 2014 arnekiel

A Chinese oil rig that was the cause of a diplomatic dispute with Vietnam has returned to work after being moved from disputed waters. In May, the 34,000 GT Hai Yang Shi You 981 (HYSY 981), a drilling rig built in 2011 and operated by China Oilfield Services, began exploratory drilling in the disputed South China Sea (SCS), roughly mid-way between the Chinese held Paracel Islands and the Vietnamese coast. The Vietnamese government protested that the action was illegal and dispatched maritime police to the location of the rig. According to a statement from China's Maritime Safety Administration, the new location of the rig is 68nm off the south-eastern tip of Hainan Island, which is about 200nm to the north-west of its previous location. The new drilling operation is expected to last until 30 September. The rig's owner, China National Offshore Oil Corporation, said it had been withdrawn after exploratory drilling was complete. Oil and gas reserves have apparently been located. Responding to suggestions that the rig had been moved for diplomatic reasons, a spokesperson for the Chinese Foreign Ministry said that the relocation of the rig was in line with the firm's own plans, and not due to external pressure. Wang Zhen, a senior geological expert at the China Engineering Academy was quoted by the Xinhua News Agency as saying that the rig was moved away from deep water as a precaution ahead of the upcoming typhoon season. Source : IHS Maritime 360

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data