Allgemeine Informationen

IMO:
MMSI:
211437270
Rufzeichen:
DA2451
Breite:
8.0 m
Länge:
30.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
281.8° / 0.0
Kompasskurs:
19.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Hamburg (Finkenwerder)
Gebiet:
Germany
Zuletzt empfangen::
2024-12-23
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-07-24
151d 12h 23m
2024-07-21
2024-07-24
3d 38m
2024-03-29
2024-07-21
113d 22h 31m
2024-03-26
2024-03-29
2d 23h 2m
2022-07-12
2024-03-26
623d 3h 30m
2022-07-11
2022-07-12
19h 43m
2022-06-30
2022-07-11
10d 23h 12m
2022-01-13
2022-06-30
168d 1h 12m
2020-07-30
2021-12-12
499d 18h 39m
2020-07-22
2020-07-30
7d 19h 20m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Hamburg
2024-12-22
Ankommen
Hamburg
2024-12-22
Abfahren
Hamburg
2024-12-22
Ankommen
Hamburg
2024-12-22
Abfahren
Hamburg
2024-12-22
Ankommen
Hamburg
2024-12-22
Abfahren
Hamburg
2024-12-22
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Four injured in alllision

Thu Aug 01 22:31:34 CEST 2019 Timsen

On Aug 1, 2019, the "Hafencity“ allided with the wharf in Övelgönne on the Elbe in Hamburg at 9.50 a.m. The ferry, coming from the Landing Bridges, headed towards the berth at an acute angle and with comparably high speed before it hit. Four persns suffered slight injuries such as bruises. Police and rescue forces attended and assisted in disembarking the passengers. A 49 year old woman and an 48 year old man were taken to a hospital in Hamburg for first aid. A steel sheet broke off the wharf, and this part was barred for ferry traffic. The police, the HADAG company and the Hamburg Port Authority launched investigations. They found out that the allision was caused by the failure of an auxiliary engine which had the failure of the main engine and electricity as a consequence, disabling the ship completely. The ferry was moved to the HADAG quay after the accident for thorough surveys. German report with photo: https://www.mopo.de/hamburg/unfall-auf-der-elbe-hadag-faehre-rammt-anleger---vier-verletzte-32946870?fbclid=IwAR3u8BUoEOtsFXyXxn8FntzHsbXHDjD7e3CF6FLg1vbMnIhU8xyuuE4JvEU

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data