GIUSEPPE LEMBO
Kurs/Position
vor 3824 Tagen
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
sold at Auction
sold at Auction with 11 other ships to Heron Venture 82,5 million Euro
Bulkcarrier with crack in St. Rupert
The "Giuseppe Lembo" pulled into the Prince Rupert harbour on Dec 6, 2012, coming from Tianjin. The bulkcarrier was escorted into the dock for some major maintenance after a crack in the hull was observed by the crew during a routine inspection on its way to Prince Rupert. Upon arrival it anchored in one of the outer anchorages, and an assessment was done to see if there were resources in Prince Rupert in terms of tugs, pilots and repair ability to fix it. It was expected that repairs were take five to 10 days depending on what was discovered during a closer inspection of the hull. The ship was the largest to dock at Northland Terminal ever. Report with photo: http://www.thenorthernview.com/news/182441901.html
News schreiben