Allgemeine Informationen

IMO:
7382732
MMSI:
538004196
Rufzeichen:
V7VR7
Breite:
62.0 m
Länge:
283.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Marshall Islands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
360.0° / 0.0
Kompasskurs:
40.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Gebiet:
NORTH ATLANTIC OCEAN
Zuletzt empfangen::
2024-12-22
vor 13 Std
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 13 Std 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-10-02
2023-11-19
47d 21h 46m
2023-04-21
2023-10-02
164d 34m
2023-04-11
2023-04-21
9d 14h 37m
2023-03-27
2023-04-11
15d 12h 34m
2023-03-18
2023-03-27
8d 7h 45m
2023-01-31
2023-03-18
46d 8h 29m
2023-01-23
2023-01-31
8d 9h 50m
2023-01-13
2023-01-23
9d 7h 32m
2022-12-05
2023-01-13
38d 22h 16m
2022-08-28
2022-11-28
91d 17h 6m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Cape Town
2023-12-20
Abfahren
Malacca Straits - Port Klang
2023-11-20
Ankommen
Kukup Island
2023-11-19
Ankommen
Kukup Island
2023-04-21
Abfahren
Kukup Island
2023-04-11
Ankommen
Anna Maria Island
2020-06-02
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Golar’s FLNG Gimi finally set sail for Port Louis

Mon Nov 20 11:59:48 CET 2023 Timsen

The FLNG 'Gimi' has departed Singapore on Nov 19. 2023, en route to Port Louis. The vessel had been subject to force majeure declarations and arbitration disputes, before being able to finally leave the yard towards BP’s Greater Tortue Ahmeyim hub in West Africa. The vessel was also subject Tto an arbitration dispute between Golar LNG and BP over a contract-interpretation dispute.

Golar Awards Keppel Another Huge LNG Carrier Conversion Contract

Wed Dec 31 17:19:01 CET 2014 arnekiel

Golar LNG awarded Keppel Shipyard a contract today worth approximatelyUSD $705 million to convert the 125,000 m3 LNG carrier Golar Gimi to a floating liquefaction facility (FLNGV). This is the second such order placed by Golar in the past week after they awarded Keppel a $735 million contract to convert the Golar Hilli into a FLNGV. Keppel Shipyard says the work scope for the conversion will be similar to that for the Hilli. Keppel Shipyard will provide the design, detailed engineering and procurement of the marine systems and all of the conversion-related construction services and Black & Veatch will provide design, procurement and commissioning support services for the topsides, as well as the liquefaction process utilizing its PRICO technology.

Keppel to Convert Second FLNGV for Golar

Mon Sep 08 10:59:20 CEST 2014 arnekiel

Keppel Shipyard Ltd, a wholly-owned subsidiary of Keppel Offshore & Marine Ltd, informed that it is in the process of finalising contracts with Golar Gimi Limited (Golar Gimi), a subsidiary of Golar LNG Limited (Golar LNG), to perform the conversion of a second Moss LNG carrier, the GIMI, into a Floating Liquefaction Vessel (FLNGV). Earlier on 3 July 2014, Keppel Shipyard was awarded a firm contract by Golar Hilli Corporation (Golar Hilli) to perform the world's first-of-its-type conversion of a Moss LNG carrier, the HILLI, into an FLNGV, and the contract included options for another two similar units. The forthcoming conversion award of the GIMI will mark the exercise of the first of these two options. The work scope for Keppel Shipyard in converting the GIMI is expected to be similar to that for the HILLI. Keppel Shipyard will be responsible for the provision of the design, detailed engineering and procurement of the marine systems and all of the conversion-related construction services. It is also expected that Keppel Shipyard's scope will include engaging Black & Veatch to provide design, procurement and commissioning support services for the topsides and liquefaction process. http://69.65.42.212/news/convert-keppel-second376536.aspx

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data