Allgemeine Informationen

IMO:
9003861
MMSI:
356055000
Rufzeichen:
3ECC9
Breite:
58.0 m
Länge:
328.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
52.2° / 0.0
Kompasskurs:
206.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Jubilee Offshore Terminal (Jubilee Offshore)
Gebiet:
Gulf of Guinea
Zuletzt empfangen::
2024-05-23
vor 189 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 293 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-12-22
2024-05-23
153d 9h 53m
2014-03-28
2014-03-28
2014-02-19
2014-02-19
2014-02-15
2014-02-17
2d 7h 2m
2014-02-07
2014-02-13
5d 21h 6m
2014-02-02
2014-02-02
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Contractor worker attempted suicide

Thu Jun 20 12:22:12 CEST 2019 Timsen

A South African man attempted suicide on the "Kwama Nkrumah". The man said to be a contractor reportedly jumped from the vessel into the waters for no apparent reason on June 18, 2019, at 2.25 p.m. Full Emergency Response procedures were activated, and the contractor was rescued at 2:33 p.m. Divers with the assistance of some tugs managed to resuscitate the man. The individual received emergency treatment and was cared for by a medical team in Accra. There was no Injury following medical assessment. Jubilee operations were not impacted. All relevant authorities have been contacted.

FPSO shutdown not to exceed 12 weeks

Mon Jul 03 08:19:35 CEST 2017 arnekiel

Tullow Oil has announced that its planned shutdown of the FPSO Kwame Nkrumah later this year, will not exceed the proposed twelve weeks. Tullow is expected to shut down its Jubilee fields operations later this year for the stabilisation, rotation and offloading system installation. It also comes on the back of the faulty turret bearing which has affected the production at the Jubilee oilfields. In its trading Statement and Operational Update for the first half of 2017, the oil company says it is confident measures put in place to solve the technical issues should be within the stipulated period. Meanwhile the Joint Venture Partners and the Government of Ghana have agreed on the need to stabilise the turret bearing and a shutdown of between five and eight weeks is planned for late 2017.

FPSO shut down after false fire alarm

Thu Jul 14 12:03:41 CEST 2016 Timsen

Engineers working on the FPSO "Kwame Nkrumah" have returned the facility to full operations off Takoradi after a false fire alarm shut down the vessel in the evening of July 12, 2016. The fire alarm completely shut down the facility cutting gas supply to Aboadze. The development resulted in a shortfall in power generation causing long hours of outages across the country. The incident compelled managers of the facility to evacuate all the workers from the floating vessel. The fire alarm, however, turned out to be a false one. Full operations have resumed on the facility.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data