Allgemeine Informationen

IMO:
9163611
MMSI:
314656000
Rufzeichen:
8PBN7
Breite:
13.0 m
Länge:
90.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Barbados
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
283.6° / 0.0
Kompasskurs:
279.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Wismar (LP5)
Gebiet:
Germany
Zuletzt empfangen::
2025-01-31
vor < 1 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-01-29
1d 21h 40m
2025-01-28
2025-01-28
50m
2025-01-28
2025-01-28
43m
2025-01-24
2025-01-27
3d 8h 14m
2025-01-22
2025-01-22
8h
2025-01-17
2025-01-18
8h 9m
2025-01-15
2025-01-16
1d 17h 41m
2025-01-11
2025-01-11
1h 49m
2025-01-11
2025-01-11
50m
2025-01-09
2025-01-10
1d 14h 37m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Wismar
2025-01-29
Ankommen
Poel
2025-01-29
Abfahren
Wismar Pilot
2025-01-29
Ankommen
Fehmarn Ost
2025-01-29
Ankommen
Fehmarn Nord
2025-01-29
Ankommen
Kiel Pilot
2025-01-29
Abfahren
Kiel Laboe
2025-01-28
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

BBS Sand grounded on the Tweed

Tue Mar 26 17:56:31 CET 2013 Timsen

On Mar 26, 2013, the "BBS Sand" ran aground enroute Koge-Berwick around 2 p.m. as it was attempting to enter Tweed Dock in the afternoon. The grounding happened as the vessel made ist way up the Tweed estuary. The dock’s pilot boat helped the vessel back into deeper water before it berthed safely. The ship was carrying a load of malting barley. The tide and strong wind contributed to the ship running aground for a short time. The ship was in Tweed Dock by 3.25 p.m. Report with photo: http://www.berwick-advertiser.co.uk/news/local-headlines/ship-runs-aground-in-tweed-estuary-1-2858501

Electronic fixed again

Wed Jul 04 13:40:59 CEST 2012 Timsen

After the fault in the electronic of the "BBS Sand" which had caused several blackouts while the ship was enroute to Emden, was found and repaired, the ship was cleared to sail again on July 3. It departed from the Zungen Quay around 5 p.m. bound for Antwerp as next port of call. German report with photo: http://www.ga-online.de/-news/artikel/100736/Ems-Irrlaeufer-wieder-bereit-zum-Auslaufen

Cargo ship suffered two engine blackouts and one collision

Sun Jul 01 15:21:58 CEST 2012 Timsen

The "BBS Sand" was in collision with the buoy 41 on the Ems on June 30, 2012, around 5 p.m. whilst coming from Klaipeda. The ship pulled the ton into the middle of the fairway before the Russian master got the ship emergency anchored and the propulsion was cleared. When the ship was clear to sail again it entered the port of Emden with tug assistance, where the police launched an investigation after the ship berthed at the Zungen Quay at 9.30 p.m. The police found out that the ship had already suffered an engine failure in the early morning after having passed the Brunsbuettel locks of the Kiel Canal around midnight. Some hours later a second blackout occurred which caused the collision. The ship was detained until the cause of the blackouts has been found out and the ship is cleared to sail. The buoy layer ""Gustav Meyer" of the Emden Shipping Authority was meanwhile called to pull the buoy 41 back on its position.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data