Allgemeine Informationen

IMO:
MMSI:
232008913
Rufzeichen:
MBGH2
Breite:
16.0 m
Länge:
38.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Restricted movement
Kurs:
120.6° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Cowes (Cowes Port)
Gebiet:
United Kingdom
Zuletzt empfangen::
2024-11-14
vor 7 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2750 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-07-04
2024-11-14
133d 12h 38m
2024-07-01
2024-07-04
2d 14h 9m
2022-07-01
2024-07-01
731d 17h 42m
2022-01-29
2022-06-16
138d 7h 15m
2017-04-22
2022-01-08
1722d 9h 27m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Southampton Approach
2024-07-04
Ankommen
Southampton Approach
2024-07-01
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Ferry service to be suspended again

Sat Nov 16 19:08:30 CET 2024 Timsen

The service of the 'Floating Bridge 6 between Cowes and East Cowes across the River Medina will have to be suspended in order to undergo maintenance work on Nov 20, 2024, due to necessary repairs. The ferry will be out of action between 9 a.m. and 6 p.m.

Ferry suspended due to cable wear and tear

Wed Nov 06 10:16:42 CET 2024 Timsen

The service of the 'Cowes Floating Bridge 6' across the River Medina has been suspended on the morning of Nov 6 due to a cable that needed replacing. Usual operational wear and tear’ meant that a cable needed to be urgently replaced, resulting in a suspension of service until the engineers had fixed the problem. Contractors arrived on site at 09:00 a.m. A launch service between East Cowes and Cowes was put in operation for foot passengers and cyclists at this time.

Ferry service suspended again

Mon Nov 09 10:53:41 CET 2020 Timsen

The 'Floating Bridge No.6', operating between Cowes to East Cowes, Isle of Wight, has been taken out of service following a technical fault, on Nov 7. The vessel was currently stuck on the Cowes side of the River Medina, which meant motorists were having to face the now-usual 10-mile diversion via Newport. The Isle of Wight (IOW) Council has confirmed that the ferry service was suspeded to allow engineers to inspect a prow hinge. The prow hinge broke and had come crashing down. The floating bridge will remain out of service until at least Nov 9. It has been confirmed that a hydraulic ram on the vessel developed a fault which meant that the prow could not be lifted, despite the hydraulic system having a complete overhaul earlier this year.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data