Allgemeine Informationen

IMO:
MMSI:
211794580
Rufzeichen:
DF2900
Breite:
12.0 m
Länge:
28.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Dredger
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
240.2° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Gebiet:
North Europe
Zuletzt empfangen::
2023-04-05
vor 747 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 747 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-02-09
2023-02-15
5d 22h 29m
2023-01-09
2023-01-11
2d 35m
2022-11-28
2023-01-09
41d 17h 23m
2019-04-01
2019-07-10
99d 16h 18m
2018-10-01
2019-04-01
182d 1h 50m
2018-08-20
2018-10-01
41d 17h 12m
2018-04-25
2018-08-20
117d 2h 8m
2018-02-20
2018-04-25
63d 21h 6m
2018-02-08
2018-02-20
11d 23h 30m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Fehmarn Ost
2023-02-15
Abfahren
Luebeck Bay
2023-02-15
Abfahren
Holtenau
2019-04-01
Ankommen
NOK Hohenhoern
2019-04-01
Ankommen
Holtenau
2019-03-28
Abfahren
Holtenau
2019-03-28
Ankommen
Holtenau
2019-01-14
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Crane boom segments detached in Barth

Wed Apr 16 11:52:41 CEST 2025 Timsen

The two upper segments of the crane boom of the 'Ferdinand' became detached on April 10, 2025, in the port of Barth. Using their own resources, the employees of the Ueckermünde-based hydraulic engineering company Colcrete managed to repair the defective crane, The damaged second-to-last segment was removed, and the upper end piece was reattached to the remaining boom. Although this shortened the boom somewhat, the reach was sufficient for the remaining sheet piles of the construction of the new marina. allowing to pull the remaining steel piles of the sheet pile barrier by the afternoon of April 14. To make things worse, the barge "Roock 84," which was alongside and was supposed to transport the 15-meter-long, two-ton sheet piles, sank on April 12. The loaded sheet piles were recovered and have been stored on the crane platform. The sunken barge was brought back to the surface on April 15. A small leak above the normal waterline led to the sinking. As it was continuously loaded with sheet piles, the barge sank deeper until the leak was below the water surface, so that the barge filled up with water in the access channel to the new Barth marina, which had recently been dredged to a depth of three meters. The barge was then completely unloaded and pumped dry. Because the leak was now above the water surface again, there was no danger as long as the barge is not moved. The dredging of the remaining sand barrier was scheduled to continue on April 22. Reports with photos: https://www.ostsee-zeitung.de/lokales/vorpommern-ruegen/ribnitz-damgarten/barth-pannen-bei-arbeiten-am-neuen-yachthafen-kran-kaputt-und-schiff-gesunken-QK3LTZCQ5RFTBFFVTVGL2IAWMM.html https://www.ostsee-zeitung.de/lokales/vorpommern-ruegen/ribnitz-damgarten/gesunkenes-arbeitsschiff-im-barther-yachthafen-gehoben-zufahrt-nach-ostern-frei-DYFYV6TWZVELXONFQ6DRB7HRVU.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data