Allgemeine Informationen

IMO:
9615896
MMSI:
271042595
Rufzeichen:
TCZX9
Breite:
18.0 m
Länge:
90.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Turkey
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
22.6° / 0.0
Kompasskurs:
22.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Dardanelles
Zuletzt empfangen::
2024-10-08
vor 37 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 45 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-11
2024-04-05
24d 3h 17m
2024-02-01
2024-02-01
32m
2024-02-01
2024-02-01
35m
2024-02-01
2024-02-01
33m
2024-02-01
2024-02-01
46m
2024-02-01
2024-02-01
31m
2024-01-31
2024-01-31
40m
2024-01-31
2024-01-31
54m
2024-01-30
2024-01-30
40m
2024-01-30
2024-01-30
36m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Marmara Island
2024-04-05
Ankommen
Marmara Island
2024-03-11
Abfahren
Marmara Island
2021-04-06
Ankommen
Marmara Island
2021-02-22
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Ferry to be repaired in Tuzla

Wed Feb 13 10:40:06 CET 2019 Timsen

A new set spare parts was provided by the owners from the manufacturer for repairs. A technical team attended in order to carry out repairs and spare part replacement. The vessel left the Gelibolu shipyard and arrived at Tuzla on Feb 11 at 08.30 a.m.

Ferry shifted repair yards

Mon Jan 07 10:50:51 CET 2019 Timsen

The "Elliyedinci Alay" has shifted from the Gokceada repair pier to the Gelibolu shipyard in order to complete permanent repairs. Repairs were still being carried out by shore based technical teams as regards to class surveyor further recommendations as of Jan 4, 2019.

Repairs of disabled ferry going on

Thu Dec 06 10:34:35 CET 2018 Timsen

A new set of spare parts for the "Elliyedinci Alay" has been provided by the owners from the manufacturer. Authorized company technical team attended on board in order to carry out further repairs and spare part replacement. The vessel remained stationary at Gokceada inner harbour ferry terminal pier as of Dec 6.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data