Allgemeine Informationen

IMO:
9442873
MMSI:
371172000
Rufzeichen:
3EQO8
Breite:
32.0 m
Länge:
199.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
320.0° / 0.0
Kompasskurs:
154.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Zeebrugge (Zuidelijk Kanaaldok)
Gebiet:
Belgium
Zuletzt empfangen::
2024-11-15
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-12
2d 9h 56m
2024-11-10
2024-11-12
2d 6h 22m
2024-11-07
2024-11-08
1d 1h 14m
2024-10-30
2024-10-31
16h 49m
2024-10-29
2024-10-29
8h 41m
2024-09-29
2024-09-29
14h 15m
2024-09-23
2024-09-23
10h 57m
2024-09-11
2024-09-12
10h 25m
2024-09-09
2024-09-10
10h 42m
2024-09-07
2024-09-08
9h 43m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Zeebrugge Breakwaters
2024-11-12
Ankommen
Wandelaar
2024-11-12
Ankommen
Vlissingen
2024-11-12
Ankommen
Terneuzen
2024-11-12
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Gash in stern repaired in Emden

Sat Apr 04 10:40:55 CEST 2015 Timsen

On Apr 3 the "Columbia Highway" left the Ems Quay in Emden again bound for Port Said, ETA Apr 12, after a gash of 1,5 meters length in the stern was welded on site. The gale force storm Niklas had pushed it against the new quay. The damage was above the water line. The investigations of the water police Emden were still going on. In spite of the fact that the ship was well secured it broke lose from all moorings. http://www.oz-online.de/-news/artikel/148362/Niklas-hinterliess-Riss-am-Autofrachter

Car carrier broke from the moorings in Emden

Tue Mar 31 21:43:49 CEST 2015 Timsen

The "Columbia Highway", having just arrived from Southampton, broke from its moorings at the Ems Pier in Emden in the afternoon of Mar 31, 2015, in the gale force storm Niklas. All nine wires broke, and the stern hit the quay several times with much force. The ship suffered a gash of 30 centimeters length at starboard side. The quay was damaged too. Tugs fought hours Long to push the ship back to the berth. The tug "Waterstraat" stabilized the car carrier at the quay during the night after it was berthed again. The ship which was bound for Deeme as next port of call was prohibited to leave. German Report with photos: https://www.emderzeitung.de/ostfriesland/~/emden-schiff-losgerissen-schlepper-im-einsatz-194993/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data