Allgemeine Informationen

IMO:
9734575
MMSI:
417222410
Rufzeichen:
4REB
Breite:
33.0 m
Länge:
200.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Sri Lanka
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
127.6° / 0.0
Kompasskurs:
131.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
INDIAN OCEAN
Zuletzt empfangen::
2024-11-16
vor 9 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 9 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-07
2024-11-08
1d 12h 26m
2024-09-19
2024-09-22
3d 21h 3m
2024-09-10
2024-09-13
2d 10h 32m
2024-09-08
2024-09-10
2d 4h 28m
2024-08-24
2024-08-28
3d 23h 12m
2024-07-01
2024-07-09
8d 20h 32m
2024-06-16
2024-06-18
2d 4h 59m
2024-04-14
2024-04-16
2d 10h 1m
2024-04-03
2024-04-04
18h 37m
2024-03-17
2024-03-18
10h 51m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Strait of Hormuz
2024-11-08
Abfahren
Strait of Hormuz
2024-11-07
Ankommen
Gulf of Kachchh
2024-11-03
Ankommen
Gulf of Kachchh
2024-10-28
Abfahren
Malacca Straits - Port Klang
2024-10-24
Ankommen
Kukup Island
2024-10-18
Ankommen
Kukup Island
2023-11-22
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

CSC takes delivery of second bulker

Wed Oct 19 10:18:46 CEST 2016 arnekiel

Ceylon Shipping Corporation (CSC) has taken delivery of its second bulk carrier, CEYLON PRINCESS at Colombo port. Constructed in China at the Avica International yard in Weihei, the 63,000 dwt, 200m long bulker is identical to sister ship, CEYLON BREEZE, which was delivered in March this year. The main purpose of CSC acquiring these new ships is to transport coal to the Puttalam Lakvijaya Power Station.

Bulkcarrier assisted distressed yacht

Wed Sep 14 11:07:24 CEST 2016 Timsen

The "Ceylon Princess" was involved in a rescue effort on Sep 12, 2016, after a yacht and its two crew were stranded off the Mauritius coast. The ship was en route to Richards Bay to collect a coal consignment for the Norochcholai coal power plant in Kalpitiya, Sri Lanka. It had left Singapore on Sep 2 and two days later, northeast of Mauritius heard a Mayday call coming from the yacht "Rebecca" which was also communicating with the Mauritius Coastguard which requested the bulkcarrier to proceed towards the troubled yacht. On reaching the yacht, it was learnt that the power and back-up system has been faulty but the two crew members were safe. The "Ceylon Princess" remained on standby until the Coastguard arrived and thereafter proceeded on its journey.

Ceylon Shipping Corporation’s second vessel Mv. Ceylon Princess delivered and ready to sail

Tue Jul 12 08:53:36 CEST 2016 arnekiel

The newly built second bulk vessel of Ceylon Shipping Corporation named "Mv. Ceylon Princess", which was constructed at AVIC International shipyard at Wehai, China was delivered on 23rd of June in the presence of a distinguished gathering led by chairman, Shashi Dhanatunge and Nishantha Muthuhettigama, the Deputy Minister of Ports and Shipping. This vessel was built alongside its sister ship Mv. Ceylon Breeze, which was delivered early this year on January 20 having almost same specifications. The vessel is 199.813 meters long, 32.251 meters wide and has the carrying capacity of 63,212 Metric Tons, the company said in its press release.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data