Allgemeine Informationen

IMO:
MMSI:
Rufzeichen:
Breite:
11.0 m
Länge:
135.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
n/a
Kurs:
138.1° /
Kompasskurs:
° /
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
Gebiet:
Germany
Zuletzt empfangen::
2011-11-02
vor 4775 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4775 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
-
-
-
-
-
-
-
-
-
-

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Passenger ship high and dry

Wed Sep 14 18:08:08 CEST 2011 Timsen

By Sep 13, 2011, the "Avalon Tranquility" was under repair at ÖSWAG in Linz on the slip. Link with photos: http://www.binnenschifferforum.de/forum/showthread.php?35079-Schiffsunglück-200-Personen-müssen-evakuiert-werden/page2

Avalon Tranquility stabilized at Vilshofen

Wed Sep 07 10:39:38 CEST 2011 Timsen

The "Avalon Tranquility" remained at Vilshofen on Sep 6 after 40 - 60 litres gas oil had been spilt before. Fire rescue and THW had laid out oil barriers and pumped off the oil. It was not yet decided when the ship which was stabilized by the "Panther" berthed alongside in the winter port of Vilshofen would be allowed to proceed to Linz for permanent repairs. Geramn website with photos: http://www.binnenschifferforum.de/forum/showthread.php?35079-Schiffsunglück-200-Personen-müssen-evakuiert-werden/page2

Complications during transit

Mon Sep 05 10:36:02 CEST 2011 Timsen

On Sep 4 at 4 p.m. divers were called one more time to the "Avalon Tranqqiulity" as the leak was too large to get the ship towed to Passau. When the towage finally started on Sep 5 at 9 a.n., the ship spilt about 20 litres diesel fuel due to technical complications. The fire rescue Vilshofen was called and surrounded the spill with oil booms. At 9 a.m. the tow continued its transit and was expected in Pasaau around 11 a.m. and Linz about 8 hours later. The Danube at Deggendorf meanwhile had been reopened ship traffic at 1.10 p.m. on Sep 4 though there were still some more problems with queued ships at river km 2263 near Loh. German report with photos and video link: http://www.pnp.de/nachrichten/heute_in_ihrer_tageszeitung/bayern/210762_Havariertes-Kreuzfahrtschiff-Komplikationen-beim-Abschleppen.html http://www.pnp/taucher.de

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data