ANYA ROBYN
Kurs/Position
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Detained by MCA with forty deficiencies including twelve grounds for detention
The vessel was detained in Portland 19 June 2012, because the fire damper was seized and the MF/HF Radio Installation was inoperative. Significant findings related to the structure and watertight integrity including: significantly corroded and holed bulkhead between the cargo hold and ballast tank; two areas where corrosion had holed accommodation bulkheads; corroded and ineffective closing devices on hold vents and missing focsle hatch cover securing arrangements. Also corroded and holed access trunking, cargo hold cable gooseneck and focsle hatch cover. Deficiencies marked as ISM were objective evidence of a serious failure, or lack of effectiveness of the implementation of the ISM Code. The inspection was suspended and the vessel detained with the requirement that the Master request the attendance of the Flag State or Registered Organisation to oversee repairs and confirm rectification of the noted deficiencies and also carry out additional surveys. The vessel was detained until Sept. 8, 2012.
News schreiben