Detained at Gillingham Pier from 31/08/2011 until 17/09/2011
The vessel was detained in Gillingham Kent on 31/08/2011 because the fixed fire extinguisher installation was inoperative as 1 of the 2 main bottles was empty and the main fire alarm not working and there was objective evidence of a serious failure or lack of effectiveness of the implementation of the ISM code. Other deficiencies identified included: the fire plan was not in the working language of the ship; the propulsion main engine had insufficient power; there were various washroom; laundry; galley and sanitary facilities on the ship that were damaged, not working unsafe or obstructed. In addition there was no water in the fire pump in the engine room. Summary: 26 deficiencies 3 grounds for detention - The vessel sailed on 17/09/2011