Allgemeine Informationen

IMO:
9107203
MMSI:
224390000
Rufzeichen:
EBWW
Breite:
23.0 m
Länge:
80.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Spain
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
222.0° / 0.0
Kompasskurs:
53.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Algeciras (Atraque No 7)
Gebiet:
Strait of Gibraltar
Zuletzt empfangen::
2024-11-17
vor 36 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 216 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-13
2024-11-17
4d 16h 4m
2024-05-20
2024-11-13
176d 16h 33m
2024-03-31
2024-05-20
49d 12h 3m
2022-01-13
2024-03-31
808d 10h 57m
2020-01-31
2021-01-31
366d 1h 28m
2020-01-12
2020-01-30
17d 10h 39m
2020-01-12
2020-01-12
1h 47m
2020-01-11
2020-01-12
19h 27m
2020-01-11
2020-01-11
3h 37m
2020-01-10
2020-01-11
22h 8m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Sizilien
2024-11-13
Abfahren
Isla de Alboran
2024-11-13
Abfahren
Pantelleria East
2024-11-13
Abfahren
Sizilien
2024-05-20
Ankommen
Isla de Alboran
2024-05-20
Ankommen
Pantelleria East
2024-05-20
Ankommen
Strait of Gibraltar
2019-02-14
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Allision in Alcudia

Sat Jul 13 17:14:01 CEST 2019 Timsen

On July 12, 2019, at 8 a.m. the ferry "Jaume III" allided with with the berthed ferry "Alcantara Dos" in the port of Alcúdia. Both ferries didn’t have passengers or cargo on board. The "Jaume III" was shifting berth to take on board passengers. The damage of the "Alcantara Dos" was minor, and the ferry left Alcúdia at midday with several hours delay bound to Ciutadella de Menorca. The "Jaume III" sustained a hull breach at the starboard side bow and was sidelined in Alcúdia.

Ferry delayed following fire

Mon Aug 27 19:30:21 CEST 2018 Timsen

The "Alcántara Dos", enroute from Alméria City’s port for Melilla arrived at its destination about seven hours late after a blaze began on its previous voyage. After the ferry had sailed from Melilla on Aug 25, 2018, a fire broke out in one of its engines around 40 minutes into the voyage. It was extinguished with the vessel’s automated fire systems and did not affect the ship's ability to sail or the safety of those on board. But the "Alcantara Dos" could only run with three of its four engines following the fire. She arrived in back in Melilla seven hours late at 4 a.m. and later at Almeria at 9 a.m. on Aug 26 It should have left Almeria for Melilla at 9 p.m on Aug 25. The 9 a.m. voyage from Melilla to Alméria on Aug 26 was suspended following the fire. 30 passengers set to travel on the ship were transferred to the "Fortuny" which sailed for Malaga at 3 p.m. Passengers bound to Alméria in the afternoon were taken on by the "Sorolla" at 7:30 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data