General information

IMO:
8513596
MMSI:
257020700
Callsign:
JXES
Width:
14.0 m
Length:
87.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
341.7° / 0.0
Heading:
329.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Volda (Volda Port)
Area:
Norway
Last seen:
2024-11-21
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-07
13d 17h 13m
2024-11-07
2024-11-07
10m
2024-11-07
2024-11-07
10m
2024-11-07
2024-11-07
12m
2024-11-07
2024-11-07
12m
2024-11-07
2024-11-07
12m
2024-11-07
2024-11-07
10m
2024-11-07
2024-11-07
10m
2024-10-22
2024-11-07
15d 23h 11m
2024-09-23
2024-10-22
28d 16h 36m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Two Norled employees diagnosed with corona virus

Thu Oct 29 10:32:33 CET 2020 Timsen

Two Norled employees have been diagnosed with the corona virus, the company stated in a press release in the night of Oct 28, 2020. One of them was on board the 'Ullensvang', which was sailing between Mannheller - Fodnes on Oct 26. The other was a crew member o the 'Hjelmeland' which operates the connection Hjelmeland-Nesvik-Skipavik.

Stuck trailer damaged ferry deck

Wed Nov 07 11:29:41 CET 2018 Timsen

On Nov 6, 2018, a trailer was stuck in the cargo deck of the "Ullensvang" in the afternoon. The trailer with steel construction on the pallet has damaged the deck above. The roof tiles were damaged so that the car deck could not be used. The ferry was sailing with a reduced capacity in the the evening due to damage to the roof deck with its losened plates. Big cars had to take one of the other ferries. At 7 p.m. the ferry was taken out of service for repairs. The crew aimed to be in normal operation on Nov 7.

Ferry due to return

Sat Sep 23 21:53:11 CEST 2017 Timsen

If the Norwegian Maritime Directorate gives green light, thr "Ullensvang" will return to traffic on the Hareid-Sulesund connection during the weekend of Sep 23/24. Actually the ship was still in Hareid. Human failure was the cause of the allision on Sep 1.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data