General information

IMO:
9320049
MMSI:
255806065
Callsign:
CQIT7
Width:
29.0 m
Length:
222.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Portugal
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
357.4° / -3.0
Heading:
357.0° / -3.0
Speed:
Max speed:
Status:
moving
Area:
Aegean Sea
Last seen:
2024-12-22
6 hours ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
8 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-19
2024-12-20
1d 14h 42m
2024-11-22
2024-11-23
15h 46m
2024-11-19
2024-11-20
12h 22m
2024-11-17
2024-11-18
23h 3m
2024-11-07
2024-11-08
1d 6h 53m
2024-11-05
2024-11-05
8h 45m
2024-11-01
2024-11-02
23h 2m
2024-10-28
2024-10-28
11h 47m
2024-10-26
2024-10-27
23h 56m
2024-10-22
2024-10-24
1d 20h 44m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kreta
2024-12-08
Enter
Pantelleria East
2024-12-06
Enter
Sizilien
2024-12-06
Enter
Isla de Alboran
2024-12-05
Enter
Strait of Gibraltar
2024-12-03
Leave
Savannah Approach
2024-11-23
Leave
Savannah Approach
2024-11-22
Enter
Note: All times are in UTC

Latest news

Repairs in Yalova completed

Tue Apr 07 11:14:49 CEST 2020 Timsen

On April 4 at 4 p.m. the 'Stadt Dresden' sailed from Yalova after completion of permanent repairs and satisfactory results were seen with life raft performance tests. It dropped anchor in pos. 37° 30.58' N 023° 52.95' E for orders on April 7. The 'İbrahim Şimşek' has been shifted from Tuzla anchorage to a shipyard in order to carry out permanent repairs by technical teams.

Container ship under repair

Sun Mar 22 18:32:48 CET 2020 Timsen

The 'Stadt Dresden' was granted a single voyage permission to the Ambarli Kumport container terminal, where all cargo was discharged. Subsequently, the vessel returned to Yalova and entered a shipyard on March 20 at 6.15 p.m. in order to carry out permanent repairs. A detailed damage survey was carried out by a Class Surveyor. The Besiktas shipyard sent technical teams which have commenced permanent repairs as per class surveyor's recommendations. The 'Ibrahim Simsek' was shifted to the Tuzla shipyard area anchorage. The class surveyor together with the owner's superintendent carried out a detailed damage survey. The vessel, which had been bound to Aliaga, remained stationary at the Tuzla shipyard anchorage as of March 22.

Damage surveys carried out

Fri Mar 13 09:49:46 CET 2020 Timsen

A damage survey was carried out aboard the 'Stadt Dresden' on March 12 by an appointed survey panel. IT turned out that the free fall rescue boat, safety connections and handrail units were heavily damaged. The poop deck side shell plating was holed, heavily damaged and needed a steel replacement in the frame of the repair. An underwater inspection was in progress in order to ascertain any damage on the propeller or rudder systems in the water. Also aboard the 'İbrahim Şimşek' a damage survey was carried out by an appointed survey panel. Various structural damages were noted at the foreship side shell plating together with anchor chains and windlasses. The crew of both was interrogated by the Harbour Master incident investigation desk. Both vessel's departure permission has been cancelled until completion of permanent or temporary repairs and remained stationary at Yalova anchorage as of March 13.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data