General information

IMO:
9748215
MMSI:
538007233
Callsign:
V7SP3
Width:
28.0 m
Length:
180.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
178.9° / 0.0
Heading:
179.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Gulf of Guinea
Last seen:
2024-05-25
12 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
12 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-05-24
2024-05-25
1d 1h 44m
2024-05-21
2024-05-24
2d 9h 46m
2024-05-16
2024-05-21
4d 16h 23m
2024-04-29
2024-04-30
1d 1h 56m
2024-04-12
2024-04-17
4d 3h 38m
2024-03-21
2024-03-23
1d 16h 19m
2024-02-27
2024-03-01
2d 19h 44m
2024-02-19
2024-02-27
7d 21h 12m
2024-02-17
2024-02-19
2d 14h 32m
2024-01-31
2024-02-02
2d 22m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Dover
2024-01-07
Enter
Calais
2024-01-06
Enter
Skagen
2024-01-01
Leave
Calais
2023-12-28
Leave
Dover
2023-12-28
Leave
Dover
2022-10-03
Enter
Calais
2022-10-03
Enter
Note: All times are in UTC

Latest news

LPG tanker assisted disabled yacht

Fri Jan 03 09:46:17 CET 2020 Timsen

The US Coast Guard and the crew of the 'Sahara Gas' assisted the two mariners from the disabled sailing vessel 'Rhapsody', approximately 288 miles east southeast of Corpus Christi, Texas, in the afternoon of Jan 2, 2020. Watchstanders at the Eighth Coast Guard District command center received an emergency position indicating radio beacon alert at 2:13 a.m. Watchstanders directed the launch of a Coast Guard Sector/Air Station Corpus Christi HC-144 Ocean Sentry aircrew and diverted the LPG tanker to investigate the location. Once on scene, the 'Sahara Gas' reported two people aboard a 37-foot sailing vessel disabled after an engine room fire. The tanker was unable to lower a life boat to render assistance due to 10-foot seas. The air crew of the HC-144 Ocean Sentry arrived on scene and established a communications schedule with the two mariners aboard the Rhapsody. With weather deteriorating, a Coast Guard Air Station Houston MH-65 Dolphin helicopter crew was launched to conduct a hoist, as well as a Coast Guard Aviation Training Center Mobile HC-144 Ocean Sentry aircrew to provide communications support. At 12:42 p.m., the MH-65 helicopter crew hoisted the two mariners and transferred them to Air Station Houston. Report with photo: https://coastguardnews.com/coast-guard-rescues-2-mariners-288-miles-offshore-corpus-christi-texas/2020/01/02/

West Africa Gas acquires two LPG vessels to diversify operations

Thu Mar 30 08:45:54 CEST 2017 arnekiel

The West Africa Gas Limited (WAGL), an Energy company owned by the Nigerian National Petroleum Corporation (NNPC) and Oceanbed (a member of the Sahara Group), has taken a step further towards becoming a fully-integrated energy company by ordering and completing the construction of a Liquefied Petroleum Gas vessel for commercial activities. The feat, the first to be achieved by any energy company in Africa, goes a long way in diversifying and strengthening the operations of the company. Ordered at the Hyundai Mipo Shipyard in May 2014, the LPG ship is the first of two vessels ordered by WAGL and is designed for transporting Liquefied Natural Gas (LNG). Each of the vessels have a capacity of 38,000 cubic metres (cbm). Named MT Africa Gas at its inauguration in Korea recently, the ship makes its first port call to the Tema Port in Ghana from its maiden voyage from Hyundai Mipo Dockyard in South Korea. The other ship, MT Sahara Gas is expected to arrive in West Africa in the coming weeks. Sharing his thoughts on this new milestone achieved by WAGL, Roland Omoreegbe, Managing Director of the company believes that the acquisition of the vessel will help in actualizing the vision of WAGL to be the foremost gas company on the continent. According to him, “our decision to acquire these vessels demonstrates clearly our commitment to serve the energy needs of all classes of consumers in Africa and beyond.” “This strategic investment” he adds, “is very crucial and underscores our commitment to meeting energy needs across the continent and indeed globally.” WAGL currently has a Gas Sale Agreement with the Government of Ghana for the supply of 180’000 standard cubic feet of Gas even as construction works at the Tema port to receive first gas for the thermal plants in the Tema energy enclave is underway. The WAGL proposition includes the construction of a jetty, dredging of a channel within. Source: GhanaWeb

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data