General information

IMO:
7814424
MMSI:
577191000
Callsign:
YJTM6
Width:
25.0 m
Length:
126.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Vanuatu
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
360.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Golfo de Panamá
Last seen:
2023-09-07
471 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2023 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2022-08-06
2022-11-18
103d 21h 16m
2022-06-30
2022-07-22
21d 21h 23m
2019-04-06
2019-08-02
117d 10h 6m
2019-03-22
2019-03-28
6d 21h 22m
2018-06-21
2018-07-09
18d 11h 50m
2018-03-05
2018-06-02
89d 23h 16m
2018-02-25
2018-03-03
5d 6h 2m
2017-09-09
2017-09-21
11d 3h 11m
2017-08-24
2017-09-08
14d 22h 19m
2016-06-26
2017-08-05
405d 19h 23m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Two injured in engine room fire

Fri Mar 15 19:16:00 CET 2019 Timsen

The "Ocean Constructor" suffered a fire in engine room on March 13, 2019, at 9.55 a.m. in the Gulf of Mexico, while laying two pipelines at the Ku-Maloob-Zaap oil field in the Campeche Sound. There were 181 people on board, including construction personnel and 25 crew members. The assistance was coodinated by the SEMAR, and a Black Hawk helicopter was deployed to take workers off the vessel. All non-essential personnel, on the whole 130 people, were transferred to different platforms of the Ku Maloob Zaap complex within four hours. Two of them suffered minor injuries but did not have to be hospitalized. The crew remained on board to fight fire with the help of the offshore vessels "Cosmos", "Bucaner" and "Don Miguel" and the patrol boats "Tenochtitlán" and "Chichen Itzá" of the Navy as well as the "MLB 104" of Textron Marine. The fire was under control at 12.45 p.m. The pipeline laying work started on Jan 16 and was due to end on April 16. Spanish reports with photos: https://www.novedadescampeche.com.mx/estado/carmen/barco-petrolero-se-incendia-en-altamar/ https://www.razon.com.mx/mexico/incendio-embarcacion-ocean-constructor-empresa-stabbert-maritime-demar-activo-ku-maloob-zaap-ciudad-del-carmen-campeche-pemex-capitania-de-puerto-de-isla-del-carmen-fuego-controlado-sin-lesionados/ http://tribunacampeche.com/carmen/2019/03/14/arde-embarcacion-ocean-constructor/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data