Allgemeine Informationen

IMO:
7360655
MMSI:
228379700
Rufzeichen:
FLXO
Breite:
9.0 m
Länge:
40.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
France
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
360.0° / 0.0
Kompasskurs:
56.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Mactan Island (Mactan Island Port)
Gebiet:
Bohol Sea
Zuletzt empfangen::
2024-12-22
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-12-02
2024-12-02
12h 56m
2024-11-18
2024-11-29
11d 1h 49m
2024-10-11
2024-11-10
29d 56m
2024-10-05
2024-10-06
17h 26m
2024-09-07
2024-09-08
14h 3m
2024-08-25
2024-09-04
10d 10h 48m
2024-08-02
2024-08-24
21d 23h 14m
2024-07-22
2024-07-27
5d 8h 30m
2024-07-15
2024-07-19
4d 6h 11m
2024-07-08
2024-07-13
4d 21h 17m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Manila Bay
2024-11-17
Abfahren
Manila Bay
2024-11-17
Ankommen
Hong Kong Approach
2024-11-10
Ankommen
Hong Kong Approach
2024-10-11
Abfahren
Balboa Approach
2023-10-28
Ankommen
Puente de las Americas
2023-10-28
Ankommen
Miraflores Locks
2023-10-28
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Departure from Boulogne delayed due to asbestos discovery

Fri Mar 13 11:05:46 CET 2020 Timsen

The 'Plastic Odyssey', a former oceanographic research vessel which being transformed into a floating plastic recycling laboratory was due to leave the port of Boulogne-sur-Mer for Concarneau but remained docked following the discovery of asbestos on board last week. Since its acquisition last October, the ship has been undergoing transformation to become a laboratory for solutions to plastic pollution. When it was due to leave the port of Boulogne-sur-Mer and head to Concarneau to continue its renovation, asbestos was found in confined spaces on ships. Immediately. All safety measures have been taken on board. The asbestos removal work will cause a delay in the departure of the vessel from one to three weeks.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data