General information

IMO:
9397200
MMSI:
636019547
Callsign:
D5UZ7
Width:
21.0 m
Length:
151.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
167.1° / 0.0
Heading:
167.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
NORTH ATLANTIC OCEAN
Last seen:
2024-11-22
4 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-10
2024-11-13
2d 15h 51m
2024-10-29
2024-11-04
6d 13h 19m
2024-10-26
2024-10-26
53m
2024-10-24
2024-10-26
1d 20h 39m
2024-10-24
2024-10-24
2h 37m
2024-10-15
2024-10-18
3d 4h 58m
2024-10-07
2024-10-12
4d 19h 21m
2024-09-23
2024-09-23
17h 7m
2024-09-07
2024-09-09
2d 17h 3m
2024-08-24
2024-09-02
9d 2h 13m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Le Havre Approach
2024-11-05
Leave
Le Havre Approach
2024-11-04
Enter
Le Havre Approach
2024-10-29
Leave
Le Havre Approach
2024-10-29
Enter
Dover
2024-10-27
Enter
Calais
2024-10-27
Enter
Note: All times are in UTC

Latest news

Bulk carrier disabled off Rhodes

Sat Jan 25 17:19:45 CET 2020 Timsen

The 'Ormi' suffered a turbo charger failure on Jan 24, 2020, at 3.35 p.m. in position 35 43 00 N, 27 53 48 E south of Rhodes island. The ship, which was en route from Kherson to Haifa with a cargo of soy beans, went adrift as the crew failed to repair the damage. The tug 'Karapiperis 18' (IMO: 8810205), was called from Mykonos to assist and took the casualty in tow towards Piraeus anchorage after the weather improved. On Jan 26 the convoy reached the port of Piraeus, where the relevant authorities inspected the vessel. On Feb 14 at 11.15 a.m. the 'Ormi' sailed from Piraeu after repairs, bound to Haifa with an ETA as of Feb 18.

Technical failure in Canakkale Strait

Sun Oct 13 19:48:28 CEST 2019 Timsen

The 'Ormi', while en route from Diliskelesi to Piraeus, suffered a technical failure during the transit of the Canakkale Strait at Nara point on Oct 10, 2019, at 7.30 p.m. Subsequently, the vessel was shifted to the Karanlik liman anchorage where repair works were commenced by the crew. On Oct 13 at 12.45 a.m. the vessel moored off Piraeus in pos. 37° 53.12' N 023° 31.86' E.

Fuel pump failure north of Kafirea

Wed Aug 15 21:43:58 CEST 2018 Timsen

The "Ormi", en route from Piraeus anchorage to Novorossiysk in ballast condition with 16 crew members on board, reported the mechanical failure of a fuel pump north of Kafirea in position 38 16 00 N, 24 46 00 E, on Aug 14, 2018, at 9 a.m. The crew carried out repairs and the vessel continued on its voyage with an ETA in Russia as of Aug 19, 10 p.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data